Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Constructions of the 7th and State St Crosswalk Improvements. Specific work includes to, right of way work, sidewalk restoration, electrical work, and a new RRFB system at the crosswalk of 7th and State St.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This project involves sliplining two sections of 24-inch sanitary sewer main and rehabilitating three 60-inch manholes near the intersection of Highway 95 and 7th Street in Bullhead City, AZ.
Posted Date
Jan 21, 2026
Due Date
Feb 25, 2026
Release: Jan 21, 2026
Close: Feb 25, 2026
This project involves sliplining two sections of 24-inch sanitary sewer main and rehabilitating three 60-inch manholes near the intersection of Highway 95 and 7th Street in Bullhead City, AZ.
AvailableThis RFP is for a demolition project for properties located on 7th Street in Moline.
Posted Date
Jan 20, 2026
Due Date
Feb 6, 2026
Release: Jan 20, 2026
Close: Feb 6, 2026
This RFP is for a demolition project for properties located on 7th Street in Moline.
AvailableRevitalization includes landscape and infrastructure improvements in addition to renovation of the historic 7th street fountain. Removal of existing hardscape, concrete bollard, landscape and miscellaneous site furnishings; installation of new hardscapes; addition of a seat platform/stage; establishment of a small lawn area; installation of new landscaping, street trees, planters and landscape buffer plantings/fencing; new site furnishings, accessories and lighting.
Posted Date
-
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Revitalization includes landscape and infrastructure improvements in addition to renovation of the historic 7th street fountain. Removal of existing hardscape, concrete bollard, landscape and miscellaneous site furnishings; installation of new hardscapes; addition of a seat platform/stage; establishment of a small lawn area; installation of new landscaping, street trees, planters and landscape buffer plantings/fencing; new site furnishings, accessories and lighting.
AvailableWork includes 100 block 7th street from RR crossing south to hwy 60/66 approx. 800 SF apply level course, tack oil, mill tie in at 60/66 intersection, and 2" type B overlay. 2,150 SF on south 7th street. 3" mill, tack oil, with 3" type B asphalt overlay; mill tie in at excelsior street and highway 60/66 with approx. 10 SF edge mill along the outside edge of the driving lanes north from excelsior to highway 60/66. After milling is complete awardee will install tack and a 1" level up coarse prior to the 2" type B asphalt surface coarse. Awardee will provide all traffic control,traffic striping, hauling and disposing of milling material to designated site.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Work includes 100 block 7th street from RR crossing south to hwy 60/66 approx. 800 SF apply level course, tack oil, mill tie in at 60/66 intersection, and 2" type B overlay. 2,150 SF on south 7th street. 3" mill, tack oil, with 3" type B asphalt overlay; mill tie in at excelsior street and highway 60/66 with approx. 10 SF edge mill along the outside edge of the driving lanes north from excelsior to highway 60/66. After milling is complete awardee will install tack and a 1" level up coarse prior to the 2" type B asphalt surface coarse. Awardee will provide all traffic control,traffic striping, hauling and disposing of milling material to designated site.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis