Pennsylvania Department of General Services
State AgencyPA
Posted
Jul 24, 2026
Sep 15, 2026
Fords Lake Dam - Dam Rehabilitation Project
Dam rehabilitation project.
Description: The Municipality of North Cowichan posted an open procurement opportunity, reference 2026-16, titled "Crofton Lake Dam Geotechnical Investigation Work Plan." The associated project is mandatory maintenance of the Crofton Lake dam under the BC Dam Safety Regulation, including removing trees and other vegetation from the dam and raising its height. North Cowichan says engineering and environmental consultants are working with its engineering staff, and lists the project timeframe as Fall 2026–December 2026 (intermittent).
City · BC, CA
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from North Cowichan.
These related opportunities are still open for bidding.
Pennsylvania Department of General Services
State AgencyPA
Posted
Jul 24, 2026
Sep 15, 2026
Dam rehabilitation project.
Dallas Forth Worth Airport Board
Special DistrictTX
Posted
-
Sep 30, 2026
Dam Reclassification.
Higher EducationVA
Posted
Aug 25, 2026
Sep 22, 2026
The College of William & Mary is seeking qualified contractors through a request for pre-qualifications for improvements to the high-hazard Lake Matoaka Dam embankment and spillway. The work includes installing an articulated concrete mat, constructing concrete training walls, repairing and modifying the existing box culvert, installing a siphon, and performing related roadway, utility, guardrail, clearing, reforestation, and landscaping work. Responses are due September 22, 2026, and the opportunity is an active construction procurement rather than a grant program.
CityVA
Posted
Aug 10, 2026
Sep 23, 2026
Seeks bids from qualified firms to provide general contracting services for dam rehabilitation. Work shall also includes excavation, backfilling, and compaction, installation of principal spillway, outlet pipes, low-level drawdown gate valve, impact basin, and riprap discharge channel, installation of seepage collection and drainage system, regrading of dam embankment slopes, casting and reinforcing concrete, erosion and sediment control, removal and proper disposal of debris and demolished materials; site cleanup, installation and testing of new ductile iron water main in concrete encasement, roadway replacement. See attached file.