Southwestern Power Administration
FederalOK
Posted
Jun 15, 2026
Oct 5, 2026
New Madrid Relay Switchboard Replacement
Removal and replacement of six (6) existing full-duplex switchboard sections.
Description: Replace the existing 480-volt main switchboard with new equipment. Replace existing aluminum feeder conductors with new copper conductors. Replace the existing 480-volt main switchboard with new equipment.
SchoolDistrict · CA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Southwestern Power Administration
FederalOK
Posted
Jun 15, 2026
Oct 5, 2026
Removal and replacement of six (6) existing full-duplex switchboard sections.
Posted
Sep 2, 2026
Oct 14, 2026
Work consists of Replacement of the existing low-voltage switchboards serving the facility, including associated feeder modifications, terminations testing, and commissioning. The work also includes temporary power provisions, phased shutdown sequencing, and cutover coordination to maintain facility operations during construction. HVAC equipment replacement and improvement in the Telecom Room, Server Room, and UPS1 Room. The work includes air duct and AHU modifications, installation of new air circulation between the Server Room and Telecom Room, system integration with the existing BMS, testing, and commissioning; the work also includes power distribution system and HVAC equipment cutover coordination.
School DistrictKS
Posted
-
Sep 15, 2026
Work includes Door replacement.
CityWA
Posted
-
Sep 16, 2026
Work includes main installation, service taps, asbestos testing and disposal, hydrant assembly replacements, and restoration services.