East Palm Canyon Drive Bridge Project RFP
The base bid work includes widening the existing drive bridge (including architectural treatment and lighting), CV sync conduit installation, constructing new curb, gutter and sidewalk, constructing a driveway and curb ramps, constructing a bus pad, constructing retaining walls, a new soundwall at the mobile home park, utility coordination including sce capacitor bank relocation, storm drain improvements, improvements to the parking lot, rehabilitating of the pedestrian bridge deck and railings adjacent to the bridge, striping, and pavement rehabilitation. The add alternate work includes additional cold plane and overlay limits, water valve adjustments, and striping and pavement markings to match the existing layout.