Phillips Farm Municipal Campus Water Treatment Facility Basin Modifications Project
Jul 19, 2026
Closes
Aug 18, 2026
The project generally consists of modifying an existing stormwater infiltration basin to an MRC Bioretention Basin, the removal of storm sewer pipe discharging into existing basin, modifications to existing basin outlet structure, grading and installation of a detention basin, and the construction of an outlet structure to direct runoff into MRC Basin and Proposed Detention Basin.
