CityTN
Posted
Nov 25, 2026
Dec 24, 2026
City Hall Sidewalk Replacement Project RFP
The selected contractor will be responsible for the following: 1. Removal and Demolition: Remove and properly dispose of the existing sidewalk concrete and any deteriorated or unsuitable materials. 2. Site Preparation: Properly prepare, grade, and compact the area to provide a stable foundation for the new sidewalk installation. 3. Concrete Replacement: Install new concrete sidewalks de- signed to meet applicable safety requirements and accessibility standards. 4. ADA Compliance: All newly installed sidewalks, pedestrian access routes, ramps, and transitions must comply with applicable Americans with Disabilities Act (ADA) requirements, including wheelchair ac- cessibility specifications. 5. Safety Standards: Ensure proper slopes, cross-slopes, surface finishes, transitions, and drainage to provide safe access for pedestrians and individuals utilizing wheelchairs or other mobility devices. 6. Cleanup: Remove all construction debris and leave the work area clean and safe upon completion.
