CityTN
Posted
Nov 25, 2026
Dec 24, 2026
City Hall Flooring Removal and Replacement Project RFP
The anticipated scope of work includes: 1. Existing flooring removal: remove and properly dispose of all existing flooring materials in the designated areas of city hall. 2. Floor preparation: inspect, clean, and prepare the existing subfloor. Address any uneven areas or deficiencies that could af- fect the installation or longevity of the new flooring. 3. Subfloor inspection: identify any moisture issues, water dam- age, structural concerns, or other underlying problems discovered during the inspection. Notify the city of graysville before proceeding with any additional repairs or work outside the original bid. 4. New flooring installation: supply and professionally install new flooring materials approved by the city. Materials should be durable, easy to maintain, and appropriate for a public municipal facility with regular pedes- trian traffic. 5. Transitions and trim: install appropriate transitions, thresh- olds, baseboards, and finishing materials as necessary to provide a clean and professional appearance. 6. Final cleanup: remove all construction debris, leftover mate- rials, and equipment. Leave all completed areas clean, safe, and ready for use.
