CityGA
Posted
Oct 30, 2026
Nov 17, 2026
Hampton City Hall Roof Replacement RFP
Provide all labor, materials and management to remove and replace the roofing. Full roof tear-off project. New 60-mil mechanically attached GAF TPO system. R-25 minimum insulation with tapered insulation. New edge metal, coping, counter flashing, and drain retrofits. 20-year GAF Diamond Pledge NDL warranty. FM 1-90 minimum wind uplift requirement. 25-sheet wood deck replacement allowance to be included. Add Alternate: 1/4" cover board beneath the membrane. Remove any existing roof top HVAC or equipment and reinstall if required.
