Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of replace existing mcc and lighting panelboard and refeed all existing loads from new equipment - replace electrical feeder from the existing main distribution switchboard to the new mcc. - provide new power monitoring system connected to the scada system - provide temporary standby generator to maintain plant operations at all times. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services for the Fourche Creek WRF Primary Sludge Pump Station Improvements, including replacement of sludge pumps, piping, a ceiling-mounted crane, an access door, and electrical gear.
Posted Date
Nov 23, 2025
Due Date
Jan 6, 2026
Release: Nov 23, 2025
Close: Jan 6, 2026
Procurement of services for the Fourche Creek WRF Primary Sludge Pump Station Improvements, including replacement of sludge pumps, piping, a ceiling-mounted crane, an access door, and electrical gear.
AvailableReplacement of three (3) existing sludge pumps with three (3) new piggyback style pumps; miscellaneous piping replacement; replacement of the existing ceiling mounted 3-way track crane with a ceiling mounted traveling bridge crane; replacement of the access door; installation of necessary electrical gear.
Posted Date
Nov 24, 2025
Due Date
Jan 8, 2026
Release: Nov 24, 2025
Close: Jan 8, 2026
Replacement of three (3) existing sludge pumps with three (3) new piggyback style pumps; miscellaneous piping replacement; replacement of the existing ceiling mounted 3-way track crane with a ceiling mounted traveling bridge crane; replacement of the access door; installation of necessary electrical gear.
Work includes selective demolition and removal of the existing belt filter press and related equipment, installation of rotary press and related equipment, and installation of pump station screening system and related equipment.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Close: Jan 13, 2026
Work includes selective demolition and removal of the existing belt filter press and related equipment, installation of rotary press and related equipment, and installation of pump station screening system and related equipment.
AvailableThe Project consists of the construction of a new finished water pumping station at the Rolling Mill Water Treatment Plant in the Town of North East and the decommissioning and demolition of the existing finished water pumping station. Work includes excavation, demolition, masonry building construction, watermain replacement, instrumentation, electrical work, control system integration, HVAC work, and site restoration. Decommissioning of the existing finished water pumping station shall include replacement of electrical raceways, furnishing and installing replacement submersible wastewater pumps and pump control panel, and capping water supply piping.
Posted Date
Dec 5, 2025
Due Date
Jan 29, 2026
Release: Dec 5, 2025
Close: Jan 29, 2026
The Project consists of the construction of a new finished water pumping station at the Rolling Mill Water Treatment Plant in the Town of North East and the decommissioning and demolition of the existing finished water pumping station. Work includes excavation, demolition, masonry building construction, watermain replacement, instrumentation, electrical work, control system integration, HVAC work, and site restoration. Decommissioning of the existing finished water pumping station shall include replacement of electrical raceways, furnishing and installing replacement submersible wastewater pumps and pump control panel, and capping water supply piping.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →