Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Bay Shore Regional Sewerage Authority
Work generally includes the following: trenchless rehabilitation of existing sanitary sewer interceptors and manholes at two locations utilizing cured-in-place pipe lining (CIPPL). Provision, installation, and maintenance of temporary bypass pumps and piping to maintain sanitary sewer service of the upstream and affected properties and connections. Installation and maintenance of temporary bypass piping ramps as required when bypass piping crosses the municipal right of way and driveways. Provision and maintenance of temporary traffic control measures to ensure safe vehicular and pedestrian access around the project site. Additional items shown on the contract documents.
Posted Date
Jul 24, 2026
Due Date
Sep 1, 2026
Release: Jul 24, 2026
Bay Shore Regional Sewerage Authority
Close: Sep 1, 2026
Work generally includes the following: trenchless rehabilitation of existing sanitary sewer interceptors and manholes at two locations utilizing cured-in-place pipe lining (CIPPL). Provision, installation, and maintenance of temporary bypass pumps and piping to maintain sanitary sewer service of the upstream and affected properties and connections. Installation and maintenance of temporary bypass piping ramps as required when bypass piping crosses the municipal right of way and driveways. Provision and maintenance of temporary traffic control measures to ensure safe vehicular and pedestrian access around the project site. Additional items shown on the contract documents.
AvailableBay Shore Regional Sewerage Authority
The work generally includes the replacement of an HVAC unit in the Authority's Plant Control Building.
Posted Date
Jun 24, 2026
Due Date
Jul 7, 2026
Release: Jun 24, 2026
Bay Shore Regional Sewerage Authority
Close: Jul 7, 2026
The work generally includes the replacement of an HVAC unit in the Authority's Plant Control Building.
Bay Shore Regional Sewerage Authority
The scope of work includes the repairs of tuyeres within the Authority's sewage sludge incinerator (NIRO) and replacement of the scrubber quench inlet flange.
Posted Date
Jun 24, 2026
Due Date
Jul 7, 2026
Release: Jun 24, 2026
Bay Shore Regional Sewerage Authority
Close: Jul 7, 2026
The scope of work includes the repairs of tuyeres within the Authority's sewage sludge incinerator (NIRO) and replacement of the scrubber quench inlet flange.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge