Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services for the Fourche Creek WRF Primary Sludge Pump Station Improvements, including replacement of sludge pumps, piping, a ceiling-mounted crane, an access door, and electrical gear.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of three (3) existing sludge pumps with three (3) new piggyback style pumps; miscellaneous piping replacement; replacement of the existing ceiling mounted 3-way track crane with a ceiling mounted traveling bridge crane; replacement of the access door; installation of necessary electrical gear.
Posted Date
Nov 24, 2025
Due Date
Jan 6, 2026
Release: Nov 24, 2025
Close: Jan 6, 2026
Replacement of three (3) existing sludge pumps with three (3) new piggyback style pumps; miscellaneous piping replacement; replacement of the existing ceiling mounted 3-way track crane with a ceiling mounted traveling bridge crane; replacement of the access door; installation of necessary electrical gear.
Premium
Access the largest public sector contact database
Increase the hydraulic throughput of the pump station. Complete the design of improvements to increase the hydraulic throughput to a firm capacity of 10,000 GPM (5 x 2,500 GPM) based on n+1 redundancy.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
Increase the hydraulic throughput of the pump station. Complete the design of improvements to increase the hydraulic throughput to a firm capacity of 10,000 GPM (5 x 2,500 GPM) based on n+1 redundancy.
AvailableThe City of Bullhead City is soliciting bids for construction improvements at the Section 10 Water Reclamation Plant, specifically for Clarifier 3 and RAS/WAS pump station upgrades. This project involves constructing a third clarifier, adding a new RAS/WAS pump, replacing two existing pumps, and includes various civil and SCADA upgrades. The estimated project cost ranges from $1,000,000 to $5,000,000 with a 180-day duration.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
The City of Bullhead City is soliciting bids for construction improvements at the Section 10 Water Reclamation Plant, specifically for Clarifier 3 and RAS/WAS pump station upgrades. This project involves constructing a third clarifier, adding a new RAS/WAS pump, replacing two existing pumps, and includes various civil and SCADA upgrades. The estimated project cost ranges from $1,000,000 to $5,000,000 with a 180-day duration.
AvailableImprovements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.