Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of three (3) existing sludge pumps with three (3) new piggyback style pumps; miscellaneous piping replacement; replacement of the existing ceiling mounted 3-way track crane with a ceiling mounted traveling bridge crane; replacement of the access door; installation of necessary electrical gear.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project Description Excavation and construction of a third clarifier and associated yard piping, addition of a new RAS/WAS pump, and replacement of two existing RAS/WAS pumps. Construction of new clarifier splitter box and demolition of existing splitter box. Upsizing of existing secondary effluent (SE) piping and addition of SE manhole (Additive Alternate No.1). Support the rehabilitation of two existing clarifiers by cleaning the existing tanks, concrete repair as identified during cleaning, and coating of the concrete in the existing tanks. Work will include, but not be limited to, excavation, concrete work, site grading and SCADA upgrades with programming performed by Owner’s SCADA programmer.
Posted Date
Dec 10, 2025
Due Date
Feb 4, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 4, 2026
Project Description Excavation and construction of a third clarifier and associated yard piping, addition of a new RAS/WAS pump, and replacement of two existing RAS/WAS pumps. Construction of new clarifier splitter box and demolition of existing splitter box. Upsizing of existing secondary effluent (SE) piping and addition of SE manhole (Additive Alternate No.1). Support the rehabilitation of two existing clarifiers by cleaning the existing tanks, concrete repair as identified during cleaning, and coating of the concrete in the existing tanks. Work will include, but not be limited to, excavation, concrete work, site grading and SCADA upgrades with programming performed by Owner’s SCADA programmer.
AvailableProcurement for the installation of a 30,000-gallon welded steel ground storage tank, a 3,000-gallon hydro-pneumatic tank, a premanufactured pump station building with packaged pump station skid controls, air compressor, flow meters, site piping, site grading, controls disinfection boosting system, and related appurtenances.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
Procurement for the installation of a 30,000-gallon welded steel ground storage tank, a 3,000-gallon hydro-pneumatic tank, a premanufactured pump station building with packaged pump station skid controls, air compressor, flow meters, site piping, site grading, controls disinfection boosting system, and related appurtenances.
AvailableThis RFP is for the construction of the Goodland Pump Station Improvements Project.
Posted Date
Jan 19, 2026
Due Date
Mar 5, 2026
Release: Jan 19, 2026
Close: Mar 5, 2026
This RFP is for the construction of the Goodland Pump Station Improvements Project.
AvailableSealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →