Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sanitary sewer rehabilitation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes : 7,089 LF clean and televise sanitary sewer pipe, all depths; 130 LF debris removal for pipes; 81 EA manhole cleaning & inspections; 27 EA manhole restoration; 1 EA 8" sanitary sewer point repair - all depths; 164 LF 10" cured-in-place-pipe sanitary sewer rehab; see attached file.
Posted Date
Jan 16, 2026
Due Date
Jan 30, 2026
Release: Jan 16, 2026
Close: Jan 30, 2026
Work includes : 7,089 LF clean and televise sanitary sewer pipe, all depths; 130 LF debris removal for pipes; 81 EA manhole cleaning & inspections; 27 EA manhole restoration; 1 EA 8" sanitary sewer point repair - all depths; 164 LF 10" cured-in-place-pipe sanitary sewer rehab; see attached file.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2026 sanitary sewer rehabilitation. Construct 2026 Sanitary Sewer Rehabilitation project including all labor, materials, and equipment necessary to construct approx. 2,438 LF of Cured in Place Pipe (CIPP) sewer main lining, pre and post internal video inspection, prerehabilitation cleaning, root cutting, protruding service removal, service reinstatement, pressure testing of service connections, injection grouting of service connections, mobilization, traffic control and miscellaneous work, including cleanup.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
2026 sanitary sewer rehabilitation. Construct 2026 Sanitary Sewer Rehabilitation project including all labor, materials, and equipment necessary to construct approx. 2,438 LF of Cured in Place Pipe (CIPP) sewer main lining, pre and post internal video inspection, prerehabilitation cleaning, root cutting, protruding service removal, service reinstatement, pressure testing of service connections, injection grouting of service connections, mobilization, traffic control and miscellaneous work, including cleanup.
AvailableRehabilitation of 7,953 LF sanitary sewer ranging 8"-21" in diameter by CIPP Lining, sanitary sewer point repairs, and manhole rehabilitations at various locations within the sanitary sewer. Work includes CIPP lining, grouting, excavation point repairs for sanitary pipe replacement, manhole repairs and adjustments, surface restoration, and miscellaneous related work and appurtenances in accordance with the contract documents.
Posted Date
Jan 16, 2026
Due Date
Feb 18, 2026
Release: Jan 16, 2026
Close: Feb 18, 2026
Rehabilitation of 7,953 LF sanitary sewer ranging 8"-21" in diameter by CIPP Lining, sanitary sewer point repairs, and manhole rehabilitations at various locations within the sanitary sewer. Work includes CIPP lining, grouting, excavation point repairs for sanitary pipe replacement, manhole repairs and adjustments, surface restoration, and miscellaneous related work and appurtenances in accordance with the contract documents.
AvailableSanitary sewer rehabilitation includes 11,092 LF 8" diameter cipp liner; 4,829 LF 10" diameter cipp liner; 4,520 LF 12" diameter cipp liner; 426 ea sewer service reinstatement. See attached files.
Posted Date
Dec 16, 2025
Due Date
Jan 29, 2026
Release: Dec 16, 2025
Close: Jan 29, 2026
Sanitary sewer rehabilitation includes 11,092 LF 8" diameter cipp liner; 4,829 LF 10" diameter cipp liner; 4,520 LF 12" diameter cipp liner; 426 ea sewer service reinstatement. See attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →