Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation of 7,953 LF sanitary sewer ranging 8"-21" in diameter by CIPP Lining, sanitary sewer point repairs, and manhole rehabilitations at various locations within the sanitary sewer. Work includes CIPP lining, grouting, excavation point repairs for sanitary pipe replacement, manhole repairs and adjustments, surface restoration, and miscellaneous related work and appurtenances in accordance with the contract documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Grand Island (Public Works) is soliciting contractors to perform sanitary sewer manhole rehabilitation (Project No. 2025-S-2), providing all equipment, labor, materials and supplies required to complete the work. The procurement is intended to address manhole degradation through lining or other rehabilitation solutions and follows prior engineering planning for FY26. Bidders must follow the solicitation documents hosted on the official posting site and submit proposals by the stated response deadline.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
The City of Grand Island (Public Works) is soliciting contractors to perform sanitary sewer manhole rehabilitation (Project No. 2025-S-2), providing all equipment, labor, materials and supplies required to complete the work. The procurement is intended to address manhole degradation through lining or other rehabilitation solutions and follows prior engineering planning for FY26. Bidders must follow the solicitation documents hosted on the official posting site and submit proposals by the stated response deadline.
AvailableProject consists of rehabilitating, preparing, and lining sanitary manholes.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
Project consists of rehabilitating, preparing, and lining sanitary manholes.
AvailableThe work will consist of rehabilitation of existing gravity sewer manholes. The work consists of approx. 391 LF of 15" Cured-In-Place Pipe, 70 manhole rehabilitation using calcium aluminum cementitious liner system with epoxy, pressure grouting interior manholes for leak prevention, replace and removal of select frame and covers, select manhole cone/chimney replacement, and flow control/bypass pumping associated stream crossing, soil stabilization, dewatering and site restoration.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
The work will consist of rehabilitation of existing gravity sewer manholes. The work consists of approx. 391 LF of 15" Cured-In-Place Pipe, 70 manhole rehabilitation using calcium aluminum cementitious liner system with epoxy, pressure grouting interior manholes for leak prevention, replace and removal of select frame and covers, select manhole cone/chimney replacement, and flow control/bypass pumping associated stream crossing, soil stabilization, dewatering and site restoration.
The City of Smithville, Missouri requests sealed proposals for sanitary sewer rehabilitation work including cured-in-place pipe and manhole rehabilitation. The base bid includes approximately 1,850 feet of CIPP and 123 vertical feet of sanitary sewer manhole rehabilitation, with a 5% bid security requirement. Bids are due at City Hall on February 19, 2026 at 2:00 PM CT, with contract documents available via the Drexel Technologies eDistribution plan room.
Posted Date
Jan 15, 2026
Due Date
Feb 19, 2026
Release: Jan 15, 2026
Close: Feb 19, 2026
The City of Smithville, Missouri requests sealed proposals for sanitary sewer rehabilitation work including cured-in-place pipe and manhole rehabilitation. The base bid includes approximately 1,850 feet of CIPP and 123 vertical feet of sanitary sewer manhole rehabilitation, with a 5% bid security requirement. Bids are due at City Hall on February 19, 2026 at 2:00 PM CT, with contract documents available via the Drexel Technologies eDistribution plan room.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis