Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Chelford City Mud's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
President
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Chelford City Mud
Work includes : 7,089 LF clean and televise sanitary sewer pipe, all depths; 130 LF debris removal for pipes; 81 EA manhole cleaning & inspections; 27 EA manhole restoration; 1 EA 8" sanitary sewer point repair - all depths; 164 LF 10" cured-in-place-pipe sanitary sewer rehab; see attached file.
Posted Date
Jan 16, 2026
Due Date
Jan 30, 2026
Release: Jan 16, 2026
Chelford City Mud
Close: Jan 30, 2026
Work includes : 7,089 LF clean and televise sanitary sewer pipe, all depths; 130 LF debris removal for pipes; 81 EA manhole cleaning & inspections; 27 EA manhole restoration; 1 EA 8" sanitary sewer point repair - all depths; 164 LF 10" cured-in-place-pipe sanitary sewer rehab; see attached file.
AvailableChelford City Mud
Work includes : 3,812 LF 6" dr18 fusible pvc by trenchless construction; 4,660 LF 8" dr18 fusible pvc by trenchless construction; 3 EA reconnect exist. Fire hydrants to new water mains, includes new 6" gate valve & box, 6" c900 dr 18 pvc cl 150 lead & all appurtenances (all depths); 1 EA 8" wet connection. Cut, plug & abandon exist. Waterline; see attached file.
Posted Date
Jan 16, 2026
Due Date
Jan 30, 2026
Release: Jan 16, 2026
Chelford City Mud
Close: Jan 30, 2026
Work includes : 3,812 LF 6" dr18 fusible pvc by trenchless construction; 4,660 LF 8" dr18 fusible pvc by trenchless construction; 3 EA reconnect exist. Fire hydrants to new water mains, includes new 6" gate valve & box, 6" c900 dr 18 pvc cl 150 lead & all appurtenances (all depths); 1 EA 8" wet connection. Cut, plug & abandon exist. Waterline; see attached file.
AvailableChelford City Mud
Work includes : 34 SY 3' wide concrete sidewalk; 100 LF 20' wide, 1' deep swale expansion, including disposal of all excavation off-site; 2 EA 7'x6" yellow concrete powder coated on bollard; 1 LS relocate exist. chlorine equipment to new chlorine room; see attached file.
Posted Date
Apr 13, 2025
Due Date
Apr 25, 2025
Release: Apr 13, 2025
Chelford City Mud
Close: Apr 25, 2025
Work includes : 34 SY 3' wide concrete sidewalk; 100 LF 20' wide, 1' deep swale expansion, including disposal of all excavation off-site; 2 EA 7'x6" yellow concrete powder coated on bollard; 1 LS relocate exist. chlorine equipment to new chlorine room; see attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.