Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : 7,089 LF clean and televise sanitary sewer pipe, all depths; 130 LF debris removal for pipes; 81 EA manhole cleaning & inspections; 27 EA manhole restoration; 1 EA 8" sanitary sewer point repair - all depths; 164 LF 10" cured-in-place-pipe sanitary sewer rehab; see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Memorial Point Utility District in Texas is soliciting bids for Phase 2 sanitary sewer cleaning and closed-circuit television (CCTV) inspection services. The project includes providing labor, equipment, and all associated work per the specifications to clean and televise designated sanitary sewer segments. Bids are due on January 27, 2026 via the buyer’s e-bidding portal.
Posted Date
Jan 9, 2026
Due Date
Jan 27, 2026
Release: Jan 9, 2026
Close: Jan 27, 2026
Memorial Point Utility District in Texas is soliciting bids for Phase 2 sanitary sewer cleaning and closed-circuit television (CCTV) inspection services. The project includes providing labor, equipment, and all associated work per the specifications to clean and televise designated sanitary sewer segments. Bids are due on January 27, 2026 via the buyer’s e-bidding portal.
AvailableWork generally consists of the rehabilitation of the sewer system on the south side of the Town and rehabilitation of pump station No. 3 The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein.
Posted Date
Dec 18, 2025
Due Date
Jan 26, 2026
Release: Dec 18, 2025
Close: Jan 26, 2026
Work generally consists of the rehabilitation of the sewer system on the south side of the Town and rehabilitation of pump station No. 3 The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein.
Work includes : 3,812 LF 6" dr18 fusible pvc by trenchless construction; 4,660 LF 8" dr18 fusible pvc by trenchless construction; 3 EA reconnect exist. Fire hydrants to new water mains, includes new 6" gate valve & box, 6" c900 dr 18 pvc cl 150 lead & all appurtenances (all depths); 1 EA 8" wet connection. Cut, plug & abandon exist. Waterline; see attached file.
Posted Date
Jan 16, 2026
Due Date
Jan 30, 2026
Release: Jan 16, 2026
Close: Jan 30, 2026
Work includes : 3,812 LF 6" dr18 fusible pvc by trenchless construction; 4,660 LF 8" dr18 fusible pvc by trenchless construction; 3 EA reconnect exist. Fire hydrants to new water mains, includes new 6" gate valve & box, 6" c900 dr 18 pvc cl 150 lead & all appurtenances (all depths); 1 EA 8" wet connection. Cut, plug & abandon exist. Waterline; see attached file.
This RFP is for the rehabilitation of the sewer system and pump station No. 3.
Posted Date
Dec 12, 2025
Due Date
Jan 26, 2026
Release: Dec 12, 2025
Close: Jan 26, 2026
This RFP is for the rehabilitation of the sewer system and pump station No. 3.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis