Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Memorial Point Utility District in Texas is soliciting bids for Phase 2 sanitary sewer cleaning and closed-circuit television (CCTV) inspection services. The project includes providing labor, equipment, and all associated work per the specifications to clean and televise designated sanitary sewer segments. Bids are due on January 27, 2026 via the buyer’s e-bidding portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of the flushing and televising of approx. 94,430 LF of 8"to 15" sanitary gravity sewer. Alternate bid #1 consists of the forcemain cleaning of approx. 3,530 LF of 4" to 8" sanitary forcemains. Alternate bid #2 consists of the forcemain cleaning of approx. 4,505 LF of 4" to 10" sanitary forcemains. Alternate bid #3 consists of the visual inspection of sanitary sewer manholes within the northwest and southeast scope areas.
Posted Date
Dec 24, 2025
Due Date
Jan 28, 2026
Release: Dec 24, 2025
Close: Jan 28, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the flushing and televising of approx. 94,430 LF of 8"to 15" sanitary gravity sewer. Alternate bid #1 consists of the forcemain cleaning of approx. 3,530 LF of 4" to 8" sanitary forcemains. Alternate bid #2 consists of the forcemain cleaning of approx. 4,505 LF of 4" to 10" sanitary forcemains. Alternate bid #3 consists of the visual inspection of sanitary sewer manholes within the northwest and southeast scope areas.
Sanitary Sewer Relining. Major items include 1,350 LF of 10” CIPP.
Posted Date
Jan 8, 2026
Due Date
Jan 22, 2026
Release: Jan 8, 2026
Close: Jan 22, 2026
Sanitary Sewer Relining. Major items include 1,350 LF of 10” CIPP.
AvailableThe project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
AvailableWork generally consists of the rehabilitation of the sewer system on the south side of the Town and rehabilitation of pump station No. 3 The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein.
Posted Date
Dec 18, 2025
Due Date
Jan 26, 2026
Release: Dec 18, 2025
Close: Jan 26, 2026
Work generally consists of the rehabilitation of the sewer system on the south side of the Town and rehabilitation of pump station No. 3 The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.