Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the flushing and televising of approx. 94,430 LF of 8"to 15" sanitary gravity sewer. Alternate bid #1 consists of the forcemain cleaning of approx. 3,530 LF of 4" to 8" sanitary forcemains. Alternate bid #2 consists of the forcemain cleaning of approx. 4,505 LF of 4" to 10" sanitary forcemains. Alternate bid #3 consists of the visual inspection of sanitary sewer manholes within the northwest and southeast scope areas.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sanitary sewer cleaning and televising service.
Posted Date
Dec 15, 2025
Due Date
Jan 7, 2026
Release: Dec 15, 2025
Close: Jan 7, 2026
Sanitary sewer cleaning and televising service.
AvailableWork include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
Posted Date
Nov 26, 2025
Due Date
Jan 14, 2026
Release: Nov 26, 2025
Close: Jan 14, 2026
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
The proposed construction consists of cleaning and televising of approx 29,934 LFt of sanitary sewer with diameters ranging from 15" to 42", and other miscellaneous items of work.
Posted Date
Nov 25, 2025
Due Date
Jan 5, 2026
Release: Nov 25, 2025
Close: Jan 5, 2026
The proposed construction consists of cleaning and televising of approx 29,934 LFt of sanitary sewer with diameters ranging from 15" to 42", and other miscellaneous items of work.
AvailableThe project consists of sanitary sewer construction including relevant residential sewage collection systems, pump stations and mainline connections.
Posted Date
Dec 2, 2025
Due Date
Jan 21, 2026
Release: Dec 2, 2025
Close: Jan 21, 2026
The project consists of sanitary sewer construction including relevant residential sewage collection systems, pump stations and mainline connections.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis