Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : 3,812 LF 6" dr18 fusible pvc by trenchless construction; 4,660 LF 8" dr18 fusible pvc by trenchless construction; 3 EA reconnect exist. Fire hydrants to new water mains, includes new 6" gate valve & box, 6" c900 dr 18 pvc cl 150 lead & all appurtenances (all depths); 1 EA 8" wet connection. Cut, plug & abandon exist. Waterline; see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes : 7,089 LF clean and televise sanitary sewer pipe, all depths; 130 LF debris removal for pipes; 81 EA manhole cleaning & inspections; 27 EA manhole restoration; 1 EA 8" sanitary sewer point repair - all depths; 164 LF 10" cured-in-place-pipe sanitary sewer rehab; see attached file.
Posted Date
Jan 16, 2026
Due Date
Jan 30, 2026
Release: Jan 16, 2026
Close: Jan 30, 2026
Work includes : 7,089 LF clean and televise sanitary sewer pipe, all depths; 130 LF debris removal for pipes; 81 EA manhole cleaning & inspections; 27 EA manhole restoration; 1 EA 8" sanitary sewer point repair - all depths; 164 LF 10" cured-in-place-pipe sanitary sewer rehab; see attached file.
AvailableInstallation of pipelines, meters, valves and appurtenances, and rehabilitation of existing water pipelines includes cleaning and cement mortar lining of approx. 769 LF of 60" steel water main; structural lining of approx. 540 LF of 60" steel water main; furnishing and installing valves, precast and cast in place valve vaults, air valves, blow-off valve assemblies, manholes and all appurtenant work along the 12,207 LF.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
Installation of pipelines, meters, valves and appurtenances, and rehabilitation of existing water pipelines includes cleaning and cement mortar lining of approx. 769 LF of 60" steel water main; structural lining of approx. 540 LF of 60" steel water main; furnishing and installing valves, precast and cast in place valve vaults, air valves, blow-off valve assemblies, manholes and all appurtenant work along the 12,207 LF.
Northwest Harris County Municipal Utility District No. 10 is soliciting bids to expand its existing .995 MGD wastewater treatment plant to 1.3 MGD. The work includes demolition, installation of new piping and valves, construction of new aeration basins and aerobic digester basins, and equipment installation (including a Neuros NX75S-C070 turbo blower). Bids are to be submitted electronically with a bid opening on 2026-01-23 at 10:00 AM CST; a non-mandatory pre-bid meeting is scheduled for 2026-01-07 at 10:00 AM.
Posted Date
Dec 28, 2025
Due Date
Jan 23, 2026
Release: Dec 28, 2025
Close: Jan 23, 2026
Northwest Harris County Municipal Utility District No. 10 is soliciting bids to expand its existing .995 MGD wastewater treatment plant to 1.3 MGD. The work includes demolition, installation of new piping and valves, construction of new aeration basins and aerobic digester basins, and equipment installation (including a Neuros NX75S-C070 turbo blower). Bids are to be submitted electronically with a bid opening on 2026-01-23 at 10:00 AM CST; a non-mandatory pre-bid meeting is scheduled for 2026-01-07 at 10:00 AM.
Work includes : water line, sanitary sewer, storm sewer and street paving.
Posted Date
Jan 16, 2026
Due Date
Feb 2, 2026
Release: Jan 16, 2026
Close: Feb 2, 2026
Work includes : water line, sanitary sewer, storm sewer and street paving.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.