Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Massachusetts Water Resources Authority
Installation of pipelines, meters, valves and appurtenances, and rehabilitation of existing water pipelines includes cleaning and cement mortar lining of approx. 769 LF of 60" steel water main; structural lining of approx. 540 LF of 60" steel water main; furnishing and installing valves, precast and cast in place valve vaults, air valves, blow-off valve assemblies, manholes and all appurtenant work along the 12,207 LF.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Massachusetts Water Resources Authority
The Massachusetts Water Resources Authority (MWRA) solicits bids for Contract No. 6543 to rehabilitate Water Main Section W10; contractors must provide all labor, materials and equipment required for the work. Electronic quotes are allowed; a remote pre-bid conference is scheduled for December 11, 2025 and bids are due January 14, 2026 at 2:00 PM local time.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Massachusetts Water Resources Authority
Close: Jan 14, 2026
The Massachusetts Water Resources Authority (MWRA) solicits bids for Contract No. 6543 to rehabilitate Water Main Section W10; contractors must provide all labor, materials and equipment required for the work. Electronic quotes are allowed; a remote pre-bid conference is scheduled for December 11, 2025 and bids are due January 14, 2026 at 2:00 PM local time.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Marshall
Work includes approx. 4,676 LF of 8" Diameter SDR-17 (Class 250) PVC Water Main; 7 EA of 8" Gate Valve; 4,140 LF of 1" HDPE Service Line; 270 LF of 8" Paved Driveway Crossing; 11,527 SF of Cut-Ins & Connections to Existing Water Mains. See outside link.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
City of Marshall
Close: Dec 18, 2025
Work includes approx. 4,676 LF of 8" Diameter SDR-17 (Class 250) PVC Water Main; 7 EA of 8" Gate Valve; 4,140 LF of 1" HDPE Service Line; 270 LF of 8" Paved Driveway Crossing; 11,527 SF of Cut-Ins & Connections to Existing Water Mains. See outside link.
AvailableClark County Water Reclamation District (CCWRD)
The Clark County Water Reclamation District is soliciting bids for the Laughlin Lift Station No. 2 Force Main Rehabilitation project. The scope includes installing dual 16-inch HDPE force mains, a new flow meter vault, a surge tank, polymer concrete manholes, and rehabilitating approximately 4,800 linear feet of 21-inch gravity sewer via CIPP. The project has an estimated cost of $17.3M to $20.2M, requires mandatory site visits, and bidders must provide required bonds.
Posted Date
Oct 21, 2025
Due Date
Dec 11, 2025
Release: Oct 21, 2025
Clark County Water Reclamation District (CCWRD)
Close: Dec 11, 2025
The Clark County Water Reclamation District is soliciting bids for the Laughlin Lift Station No. 2 Force Main Rehabilitation project. The scope includes installing dual 16-inch HDPE force mains, a new flow meter vault, a surge tank, polymer concrete manholes, and rehabilitating approximately 4,800 linear feet of 21-inch gravity sewer via CIPP. The project has an estimated cost of $17.3M to $20.2M, requires mandatory site visits, and bidders must provide required bonds.
AvailableCobb County-Marietta Water Authority
Seeking pre-qualification packages from contractors for upcoming ductile iron pipe water main construction projects.
Posted Date
Dec 1, 2025
Due Date
Jan 5, 2026
Release: Dec 1, 2025
Cobb County-Marietta Water Authority
Close: Jan 5, 2026
Seeking pre-qualification packages from contractors for upcoming ductile iron pipe water main construction projects.