Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Northwest Harris County Municipal Utility District No. 10 is soliciting bids to expand its existing .995 MGD wastewater treatment plant to 1.3 MGD. The work includes demolition, installation of new piping and valves, construction of new aeration basins and aerobic digester basins, and equipment installation (including a Neuros NX75S-C070 turbo blower). Bids are to be submitted electronically with a bid opening on 2026-01-23 at 10:00 AM CST; a non-mandatory pre-bid meeting is scheduled for 2026-01-07 at 10:00 AM.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 64 SY 4 1/2" thick reinforced concrete sidewalk and mow strip, including sand base; 308 SY excavation for roadway and sidewalks, dispose of excess materials off site; 244 SY 7" concrete pavement including construction joints; 195 CY 8" stabilized subgrade; 85 LF sawcut and dowel into existing concrete pavement to ensure proper joint (match existing elevation per plans); 235 LF expand existing drainage swale including turf establishment and dispose spoils/excess materials off site; 875 LF provide and install reinforced filter fabric fence (includes removal and disposal after project completion). See attached files.
Posted Date
Dec 22, 2025
Due Date
Jan 23, 2026
Release: Dec 22, 2025
Close: Jan 23, 2026
Work includes 64 SY 4 1/2" thick reinforced concrete sidewalk and mow strip, including sand base; 308 SY excavation for roadway and sidewalks, dispose of excess materials off site; 244 SY 7" concrete pavement including construction joints; 195 CY 8" stabilized subgrade; 85 LF sawcut and dowel into existing concrete pavement to ensure proper joint (match existing elevation per plans); 235 LF expand existing drainage swale including turf establishment and dispose spoils/excess materials off site; 875 LF provide and install reinforced filter fabric fence (includes removal and disposal after project completion). See attached files.
AvailableConstruction of the wastewater treatment plant no. 1 - Phase 1 (0.15 MGD).
Posted Date
Dec 26, 2025
Due Date
Jan 22, 2026
Release: Dec 26, 2025
Close: Jan 22, 2026
Construction of the wastewater treatment plant no. 1 - Phase 1 (0.15 MGD).
AvailableThe City of Raleigh, North Carolina, is seeking qualified firms to provide construction services for the expansion of the DE Benton Water Treatment Plant. This project aims to enhance the plant's filtration capacity from 15 million gallons per day (MGD) to 20 MGD through the addition of two new biological aerated filters (BAF) and two dual-media filters.
Posted Date
Jan 8, 2026
Due Date
Feb 11, 2026
Release: Jan 8, 2026
Close: Feb 11, 2026
The City of Raleigh, North Carolina, is seeking qualified firms to provide construction services for the expansion of the DE Benton Water Treatment Plant. This project aims to enhance the plant's filtration capacity from 15 million gallons per day (MGD) to 20 MGD through the addition of two new biological aerated filters (BAF) and two dual-media filters.
Provide Southside Water Reclamation Facility Expansion to 9.0 MGD.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Provide Southside Water Reclamation Facility Expansion to 9.0 MGD.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis