Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 64 SY 4 1/2" thick reinforced concrete sidewalk and mow strip, including sand base; 308 SY excavation for roadway and sidewalks, dispose of excess materials off site; 244 SY 7" concrete pavement including construction joints; 195 CY 8" stabilized subgrade; 85 LF sawcut and dowel into existing concrete pavement to ensure proper joint (match existing elevation per plans); 235 LF expand existing drainage swale including turf establishment and dispose spoils/excess materials off site; 875 LF provide and install reinforced filter fabric fence (includes removal and disposal after project completion). See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of 2.0 MGD wastewater treatment plant expansion.
Posted Date
Nov 21, 2025
Due Date
Jan 8, 2026
Release: Nov 21, 2025
Close: Jan 8, 2026
Construction of 2.0 MGD wastewater treatment plant expansion.
AvailableSupply and install a packaged wastewater treatment plant, pumps, electrical, SCADA, forcemain, non-potable water system, lift station, wastewater treatment plant site work and all associated appurtenances.
Posted Date
Nov 23, 2025
Due Date
Jan 6, 2026
Release: Nov 23, 2025
Close: Jan 6, 2026
Supply and install a packaged wastewater treatment plant, pumps, electrical, SCADA, forcemain, non-potable water system, lift station, wastewater treatment plant site work and all associated appurtenances.
AvailableProvide Southside Water Reclamation Facility Expansion to 9.0 MGD.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Provide Southside Water Reclamation Facility Expansion to 9.0 MGD.
AvailableConstruction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Construction of wastewater treatment plant expansion.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis