Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of the wastewater treatment plant no. 1 - Phase 1 (0.15 MGD).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of 2.0 MGD wastewater treatment plant expansion.
Posted Date
Nov 21, 2025
Due Date
Jan 8, 2026
Release: Nov 21, 2025
Close: Jan 8, 2026
Construction of 2.0 MGD wastewater treatment plant expansion.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of relocate the phase i package headworks, install two (2) new equalization (EQ) basins with associated pump station, install two (2) new aeration basins including fine bubble diffusers, a selector tank, and a swing zone, install one (1) new 75' diameter secondary clarifier, modify the existing (phase I) RAS pump station, install new (phase II) RAS pump station, install two (2) new disc filters, expand effluent pump station, upgrade the existing aerobic digestion tank with new equipment and decant system, convert existing digester decant wet well pump station to duplex sludge transfer pump station. See attached bid ad.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Work consist of relocate the phase i package headworks, install two (2) new equalization (EQ) basins with associated pump station, install two (2) new aeration basins including fine bubble diffusers, a selector tank, and a swing zone, install one (1) new 75' diameter secondary clarifier, modify the existing (phase I) RAS pump station, install new (phase II) RAS pump station, install two (2) new disc filters, expand effluent pump station, upgrade the existing aerobic digestion tank with new equipment and decant system, convert existing digester decant wet well pump station to duplex sludge transfer pump station. See attached bid ad.
AvailableScope includes the following proposed improvements: demolition work; site civil improvements include onsite stormwater structures, a storage pond, and earthwork; removal of two (2) existing static screens and installation of two (2) rotary drum screens at the existing headworks; a new flow splitting structure; a proposed extended-air package treatment plant with a center ring clarifier; a new standalone chlorine contact tank and sodium hypochlorite feed system; three (3) vertical turbine effluent disposal pumps; rehabilitation of the existing effluent disposal facilities including actuated isolation valves, replacement of water cannon sprayer heads, and a radio communication system; electrical and control improvements including duct banks and access manholes; and other improvements.
Posted Date
Nov 20, 2025
Due Date
Jan 8, 2026
Release: Nov 20, 2025
Close: Jan 8, 2026
Scope includes the following proposed improvements: demolition work; site civil improvements include onsite stormwater structures, a storage pond, and earthwork; removal of two (2) existing static screens and installation of two (2) rotary drum screens at the existing headworks; a new flow splitting structure; a proposed extended-air package treatment plant with a center ring clarifier; a new standalone chlorine contact tank and sodium hypochlorite feed system; three (3) vertical turbine effluent disposal pumps; rehabilitation of the existing effluent disposal facilities including actuated isolation valves, replacement of water cannon sprayer heads, and a radio communication system; electrical and control improvements including duct banks and access manholes; and other improvements.
AvailableConstruction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Construction of wastewater treatment plant expansion.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →