Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : 34 SY 3' wide concrete sidewalk; 100 LF 20' wide, 1' deep swale expansion, including disposal of all excavation off-site; 2 EA 7'x6" yellow concrete powder coated on bollard; 1 LS relocate exist. chlorine equipment to new chlorine room; see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes : 3,812 LF 6" dr18 fusible pvc by trenchless construction; 4,660 LF 8" dr18 fusible pvc by trenchless construction; 3 EA reconnect exist. Fire hydrants to new water mains, includes new 6" gate valve & box, 6" c900 dr 18 pvc cl 150 lead & all appurtenances (all depths); 1 EA 8" wet connection. Cut, plug & abandon exist. Waterline; see attached file.
Posted Date
Jan 16, 2026
Due Date
Jan 30, 2026
Release: Jan 16, 2026
Close: Jan 30, 2026
Work includes : 3,812 LF 6" dr18 fusible pvc by trenchless construction; 4,660 LF 8" dr18 fusible pvc by trenchless construction; 3 EA reconnect exist. Fire hydrants to new water mains, includes new 6" gate valve & box, 6" c900 dr 18 pvc cl 150 lead & all appurtenances (all depths); 1 EA 8" wet connection. Cut, plug & abandon exist. Waterline; see attached file.
AvailableWork includes : 7,089 LF clean and televise sanitary sewer pipe, all depths; 130 LF debris removal for pipes; 81 EA manhole cleaning & inspections; 27 EA manhole restoration; 1 EA 8" sanitary sewer point repair - all depths; 164 LF 10" cured-in-place-pipe sanitary sewer rehab; see attached file.
Posted Date
Jan 16, 2026
Due Date
Jan 30, 2026
Release: Jan 16, 2026
Close: Jan 30, 2026
Work includes : 7,089 LF clean and televise sanitary sewer pipe, all depths; 130 LF debris removal for pipes; 81 EA manhole cleaning & inspections; 27 EA manhole restoration; 1 EA 8" sanitary sewer point repair - all depths; 164 LF 10" cured-in-place-pipe sanitary sewer rehab; see attached file.
AvailableNorthwest Harris County Municipal Utility District No. 10 is soliciting bids to expand its existing .995 MGD wastewater treatment plant to 1.3 MGD. The work includes demolition, installation of new piping and valves, construction of new aeration basins and aerobic digester basins, and equipment installation (including a Neuros NX75S-C070 turbo blower). Bids are to be submitted electronically with a bid opening on 2026-01-23 at 10:00 AM CST; a non-mandatory pre-bid meeting is scheduled for 2026-01-07 at 10:00 AM.
Posted Date
Dec 28, 2025
Due Date
Jan 23, 2026
Release: Dec 28, 2025
Close: Jan 23, 2026
Northwest Harris County Municipal Utility District No. 10 is soliciting bids to expand its existing .995 MGD wastewater treatment plant to 1.3 MGD. The work includes demolition, installation of new piping and valves, construction of new aeration basins and aerobic digester basins, and equipment installation (including a Neuros NX75S-C070 turbo blower). Bids are to be submitted electronically with a bid opening on 2026-01-23 at 10:00 AM CST; a non-mandatory pre-bid meeting is scheduled for 2026-01-07 at 10:00 AM.
AvailableConstruct the demolition of the municipal water treatment plant.
Posted Date
Dec 25, 2025
Due Date
Jan 29, 2026
Release: Dec 25, 2025
Close: Jan 29, 2026
Construct the demolition of the municipal water treatment plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.