ITB-FAF-FY27_263-CP25006-5 SCVMC Bldg. K NPC 4, Bldg. M NPC 4 and NPC 5 Underground Storage Tank project
Construction and upgrade work at Santa Clara Valley Medical Center (SCVMC) including Building K NPC 4 structural upgrades, Building M NPC 4 partial upgrades, and NPC 5 underground storage tank and related site improvements. Scope includes architectural modifications for structural upgrade, fire sprinkler system upgrades and restraints, anchoring of non-compliant equipment, verification/documentation of existing systems, installation of emergency sanitary storage tanks, accessible path and parking improvements, and stormwater management/bio-retention design. All work must be performed in occupied buildings with phasing and mitigation measures to limit impacts on occupants and must conform to the Drawings and Project Manual and any approved revisions or addenda.