Open RFP

Completion of Mann Lakes Raw Water Conveyance System RFP

Description: Project includes completion of a river intake; a CMU South Electrical and Controls building; completion of a water transmission system to move raw water from the South Platte River to the Mann Lakes; construction of a cast-in-place concrete Wet Well to move water from Lake 1 to the South Platte River; intake and trash rack within Lake 1; excavation from stockpile, haul and controlled placement of approx. 13,400 CY of fill material around the cast-in-place Wet Well; electrical and controls work associated with the North and South Control buildings; miscellaneous piping (force main trench/bore installations) to connect wet wells to existing vaults; miscellaneous piping to complete the Mann Nyholt line; completion and final placement of 840 cubic yards of riprap.

Buyer
Released
Sep 1, 2026
Closes
Oct 6, 2026(26 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts