Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction for college st drainage repair.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction services for flooding, street, and drainage system improvements, including grading, storm drainage, resurfacing, and utility relocation, in the Highland Neighborhood.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Construction services for flooding, street, and drainage system improvements, including grading, storm drainage, resurfacing, and utility relocation, in the Highland Neighborhood.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of removing approx. 685 FT of existing 60" CMP and installing approx. of 75 FT of 60” RCP under the two roads and creating approx. 530 FT long storm ditch through the field. Work includes filling existing sinkholes, removing and replacing two double wing catch basins, removing 1 existing headwall while installing 3 new headwalls, hauling off approx. 4,850 CF of dirt to create storm ditch, approx. 120 LF of curb and gutter replacement, approx. 235 SY of milling and overlay/pavement patch, traffic control, erosion control, and other miscellaneous work.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
Project consists of removing approx. 685 FT of existing 60" CMP and installing approx. of 75 FT of 60” RCP under the two roads and creating approx. 530 FT long storm ditch through the field. Work includes filling existing sinkholes, removing and replacing two double wing catch basins, removing 1 existing headwall while installing 3 new headwalls, hauling off approx. 4,850 CF of dirt to create storm ditch, approx. 120 LF of curb and gutter replacement, approx. 235 SY of milling and overlay/pavement patch, traffic control, erosion control, and other miscellaneous work.
AvailableThe City of Springfield, Georgia is soliciting sealed bids for construction of drainage improvements along West Fourth Street. The project includes installation of approximately 208 LF of 24-inch RCP with an end section and grate inlets, abandonment of 24-inch CMP with flowable fill, and associated grading, erosion control, asphalt removal/replacement, traffic control, and grassing. Bids are due at City Hall, 130 S. Laurel St, Springfield, GA 31329, with plans/specs available from Parker Engineering (Statesboro, GA) for purchase.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
The City of Springfield, Georgia is soliciting sealed bids for construction of drainage improvements along West Fourth Street. The project includes installation of approximately 208 LF of 24-inch RCP with an end section and grate inlets, abandonment of 24-inch CMP with flowable fill, and associated grading, erosion control, asphalt removal/replacement, traffic control, and grassing. Bids are due at City Hall, 130 S. Laurel St, Springfield, GA 31329, with plans/specs available from Parker Engineering (Statesboro, GA) for purchase.
AvailableThis project area is within a drainage area of approx 300 acres and the improvements will include culvert and pipe system upgrades.
Posted Date
Dec 30, 2025
Due Date
Jan 21, 2026
Release: Dec 30, 2025
Close: Jan 21, 2026
This project area is within a drainage area of approx 300 acres and the improvements will include culvert and pipe system upgrades.