Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Springfield, Georgia is soliciting sealed bids for construction of drainage improvements along West Fourth Street. The project includes installation of approximately 208 LF of 24-inch RCP with an end section and grate inlets, abandonment of 24-inch CMP with flowable fill, and associated grading, erosion control, asphalt removal/replacement, traffic control, and grassing. Bids are due at City Hall, 130 S. Laurel St, Springfield, GA 31329, with plans/specs available from Parker Engineering (Statesboro, GA) for purchase.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Install 208 LF 24" RCP, 24" FES, and grate inlets. Work shall also include filling 24" CMP with flowable fill, grading, silt fence, inlet protection, removing and replacing asphalt, traffic control, and grassing.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
Install 208 LF 24" RCP, 24" FES, and grate inlets. Work shall also include filling 24" CMP with flowable fill, grading, silt fence, inlet protection, removing and replacing asphalt, traffic control, and grassing.
AvailablePremium
Access the largest public sector contact database
The City of St. Gabriel seeks sealed bids for construction to improve drainage and add sidewalks along Morris Street, including driveway removal/addition, excavation and embankment, installation of sidewalks, drainage pipe and drainage structures, and temporary traffic control. This is a local public works construction project, not a grant, with bids due December 18, 2025.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
The City of St. Gabriel seeks sealed bids for construction to improve drainage and add sidewalks along Morris Street, including driveway removal/addition, excavation and embankment, installation of sidewalks, drainage pipe and drainage structures, and temporary traffic control. This is a local public works construction project, not a grant, with bids due December 18, 2025.
AvailableThe City of Louisville, Georgia is seeking proposals for the construction of roadway and drainage improvements on Jewell Lane and Second Street. The project includes a double headwall for 36" storm pipes, asphalt overlay, 37 L.F. of 24" RCP storm pipe, a storm manhole, traffic control, rip rap, and soil erosion and sediment control. Bidders must have a State of Georgia Contractor License and provide a Bid Bond of at least 5% of the bid amount.
Posted Date
-
Due Date
Dec 15, 2025
Close: Dec 15, 2025
The City of Louisville, Georgia is seeking proposals for the construction of roadway and drainage improvements on Jewell Lane and Second Street. The project includes a double headwall for 36" storm pipes, asphalt overlay, 37 L.F. of 24" RCP storm pipe, a storm manhole, traffic control, rip rap, and soil erosion and sediment control. Bidders must have a State of Georgia Contractor License and provide a Bid Bond of at least 5% of the bid amount.
AvailableRelease: Dec 3, 2025
Close: Dec 18, 2025
Work includes street resurfacing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis