Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Louisville
The City of Louisville, Georgia is seeking proposals for the construction of roadway and drainage improvements on Jewell Lane and Second Street. The project includes a double headwall for 36" storm pipes, asphalt overlay, 37 L.F. of 24" RCP storm pipe, a storm manhole, traffic control, rip rap, and soil erosion and sediment control. Bidders must have a State of Georgia Contractor License and provide a Bid Bond of at least 5% of the bid amount.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Borough of Seaside Park
Street roadway improvements.
Posted Date
Nov 7, 2025
Due Date
Dec 2, 2025
Release: Nov 7, 2025
Borough of Seaside Park
Close: Dec 2, 2025
Street roadway improvements.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Brownsville
Coffee Road Roadway, Drainage, and Utility Improvements Project. Work includes demolition, site grading, installation of storm drainage and water/wastewater utilities, roadway reconstruction, paving, striping, and associated traffic control includes 1,763 LF 24" class III RCP, 2 EA 4 foot diameter precast concrete manhole, 20 LF 6" DR-25 PVC fire line (incl. all reqd. fittings, restraints, and adapters), 3,150 LF 12" DR-25 PVC waterline (incl. all reqd. fittings, restraints, and adapters), 1,045 LF 12' SDR-35 PVC sanitary sewer line 0-8 foot depht, 20 LF 20" open cut steel casing.
Posted Date
Oct 18, 2025
Due Date
Dec 2, 2025
Release: Oct 18, 2025
City of Brownsville
Close: Dec 2, 2025
Coffee Road Roadway, Drainage, and Utility Improvements Project. Work includes demolition, site grading, installation of storm drainage and water/wastewater utilities, roadway reconstruction, paving, striping, and associated traffic control includes 1,763 LF 24" class III RCP, 2 EA 4 foot diameter precast concrete manhole, 20 LF 6" DR-25 PVC fire line (incl. all reqd. fittings, restraints, and adapters), 3,150 LF 12" DR-25 PVC waterline (incl. all reqd. fittings, restraints, and adapters), 1,045 LF 12' SDR-35 PVC sanitary sewer line 0-8 foot depht, 20 LF 20" open cut steel casing.
AvailableCity of Clarksdale
The City of Clarksdale is soliciting bids for the Spruce Street Drainage Improvements project, which includes removal and replacement of inlet drainage structures, concrete pipe, curb and gutter, asphalt pavement, landscape rehabilitation, and replacement of city signs. The contract time is 180 consecutive calendar days with an estimated budget of $500,000–$2,000,000; bids close on 2025-12-04.
Posted Date
Oct 31, 2025
Due Date
Dec 4, 2025
Release: Oct 31, 2025
City of Clarksdale
Close: Dec 4, 2025
The City of Clarksdale is soliciting bids for the Spruce Street Drainage Improvements project, which includes removal and replacement of inlet drainage structures, concrete pipe, curb and gutter, asphalt pavement, landscape rehabilitation, and replacement of city signs. The contract time is 180 consecutive calendar days with an estimated budget of $500,000–$2,000,000; bids close on 2025-12-04.
AvailableGilchrist County
Drainage improvements.
Posted Date
Nov 7, 2025
Due Date
Dec 2, 2025
Release: Nov 7, 2025
Gilchrist County
Close: Dec 2, 2025
Drainage improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →