Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This solicitation requests proposals for traffic signal mast arm and pole repainting in Tennessee. It was published on 2025-12-30 and closes on 2026-01-29 at 2:00 PM CST (2026-01-29T20:00:00Z). Bid documents and contact information are available on the buyer's BidNet Direct posting but require registration to access.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Surface preparation and repainting of one (1) to two (2) intersections as required for a completed project. Each intersection may contain traffic signal arms, mast arm poles and related pedestrian poles.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Surface preparation and repainting of one (1) to two (2) intersections as required for a completed project. Each intersection may contain traffic signal arms, mast arm poles and related pedestrian poles.
AvailableRemoving and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
Posted Date
Nov 17, 2025
Due Date
Jan 25, 2026
Procuring Traffic Signal Pole Caps for Type 1W, 2W, 3W Signal Poles for installation and maintenance projects throughout the City.
Posted Date
-
Due Date
Jan 26, 2026
Release: -
Close: Jan 26, 2026
Procuring Traffic Signal Pole Caps for Type 1W, 2W, 3W Signal Poles for installation and maintenance projects throughout the City.
AvailableRelease: Jan 14, 2026
Close: Jan 22, 2026
Supply and delivery of mast arm signs.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Nov 17, 2025
Close: Jan 25, 2026
Removing and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
Available