Retrieving RFP details
Release
Close
National Guard Bureau (NGB)
The miscellaneous safety improvements including signals. 1 LS clearing & grubbing, 795 CY borrow excavation, 905 LF saw cutting, 178 LF 18" concrete pipe culvert, 26 LF 18" corrugated metal pipe culvert, 4,146 SF 4" concrete sidewalk, signage, pavement marking, seeding.
20250207_BidAuth
zip
Michigan Department of Technology, Management and Budget
Traffic signal modernization including mast arm mounted LED traffic signals, back plates and countdown pedestrian signals.
New York State Thruway Authority
Provide pavement rehabilitation, safety improvements and miscellaneous work. Perform vertical clearance improvements. Replace pier protection at the NY Route 33 overpass. Replace median drainage trunkline including drainage structures. Replace existing temporary concrete median barrier with permanent concrete single slope barrier. Replace 5 overhead span sign structures and replace 1 cantilever sign structure. Mill 2" of asphalt and replace with new 2" of asphalt. Replace existing guiderail with new guiderail at various locations. Replace existing culvert end sections, clean inverts, and clean ditches of various small culverts. Replace various ground mounted traffic signs. Replace all roadway pavement striping. Restore disturbed areas and clean-up as directed by the Engineer.
Village of Painted Post
Walking trail safety improvements.
City of Athens
Construction of roadway safety improvements and traffic signalization.
Release
Jan 11, 2025
Close
Feb 07, 2025