CityMN
Jul 20, 2026
Closes
Aug 13, 2026
TH 25 / CSAH 3 Intersection Improvements
Project includes clear & grub 4ea; watermain fittings 1,138 lb; excavation - common1, 482 cy; casting assembly 13 ea; aggregate base (cv) class 51, 518cu yd; construct drainage structure 114 lf; type 12. 5 bituminous mixture 1,149 ton; concrete walk 7,864 sf; remove pipe 1,421 lf; concrete curb and gutter 2,179 lf 12"-48"; rc pipe sewer 851 lf 6"; concrete driveway 351 sy; 4"-8" sanitary service pipe 239 lf; lighting system 1 ls; 6"-10" gate valve and box 4 ea; sign 211 sf; 6"-10" pvc watermain 482 lf 4"-24" line ground in 3,810 lf; 18" pvc casing pipe 230 lf; pavement message ground in 231 sf.