Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 3 EA 5-million-gallon clearwell demolition; 1 EA west flume junction box (area 96) installation; 2 EA mechanical bulkhead installation (temporary); 1 EA contingency structure (structure 97) modification; 1 EA manual slide gate installation; 84" piping installation (lump sum); 12" pipe and diffusion nozzle installation; 84" cast-in-place concrete buoyancy collars; and 69. 5 HA area grading, hydroseeding, and sodding.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the repair of the underground clearwell water storage tank at Water Treatment Plant (WTP) #3.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
This RFP is for the repair of the underground clearwell water storage tank at Water Treatment Plant (WTP) #3.
AvailablePremium
Access the largest public sector contact database
Work contract of repair of the underground clearwell water storage tank.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Work contract of repair of the underground clearwell water storage tank.
AvailableWork consists of Replacement of approx. 125 LF of existing 24" infiltration gallery along the bank of the tongue river, raw water pumping improvements, water treatment plant improvements, and installation of a new SCADA system.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
Close: Dec 18, 2025
Work consists of Replacement of approx. 125 LF of existing 24" infiltration gallery along the bank of the tongue river, raw water pumping improvements, water treatment plant improvements, and installation of a new SCADA system.
AvailableWater Treatment Plant Raw Water and Clarification Improvements CMAR.
Posted Date
Nov 3, 2025
Due Date
Dec 17, 2025
Release: Nov 3, 2025
Close: Dec 17, 2025
Water Treatment Plant Raw Water and Clarification Improvements CMAR.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis