Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Corvallis is soliciting sealed proposals from qualified firms to provide engineering consultant services to support repair of a failing clearwell (Clearwell 1) at the Taylor Water Treatment Plant, including structural evaluations, plans and specifications, cost estimating, permitting, bid document production, and construction-phase services. Selection will be done via a Qualifications-Based Selection (QBS) process and the estimated value is approximately $150,000$200,000. The solicitation was posted in mid-January 2026 and the response deadline is February 19, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx. 3 EA 5-million-gallon clearwell demolition; 1 EA west flume junction box (area 96) installation; 2 EA mechanical bulkhead installation (temporary); 1 EA contingency structure (structure 97) modification; 1 EA manual slide gate installation; 84" piping installation (lump sum); 12" pipe and diffusion nozzle installation; 84" cast-in-place concrete buoyancy collars; and 69. 5 HA area grading, hydroseeding, and sodding.
Posted Date
Dec 3, 2025
Due Date
Jan 28, 2026
Release: Dec 3, 2025
Close: Jan 28, 2026
Work includes approx. 3 EA 5-million-gallon clearwell demolition; 1 EA west flume junction box (area 96) installation; 2 EA mechanical bulkhead installation (temporary); 1 EA contingency structure (structure 97) modification; 1 EA manual slide gate installation; 84" piping installation (lump sum); 12" pipe and diffusion nozzle installation; 84" cast-in-place concrete buoyancy collars; and 69. 5 HA area grading, hydroseeding, and sodding.
AvailableProvide professional engineering consultant services for the wastewater treatment plant and collection system expansion. The scope of this proposal will include engineering consultation as requested for the expansion of the sanitary sewer expansion and wwtp expansion.
Posted Date
Jan 14, 2026
Due Date
Feb 1, 2026
Release: Jan 14, 2026
Close: Feb 1, 2026
Provide professional engineering consultant services for the wastewater treatment plant and collection system expansion. The scope of this proposal will include engineering consultation as requested for the expansion of the sanitary sewer expansion and wwtp expansion.
AvailableWork consists of approx. 1,500 SY of asphalt paving overlay (mill and fill); 1,500 SY of asphalt paving-full depth replacement, including base course; 400 CY of backfill undercut areas w/ crushed stone (including hauling and compaction); 400 CY of undercut (below subgrade) unsuitable soils, haul, and dispose on-site; see outside links for more details.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
Work consists of approx. 1,500 SY of asphalt paving overlay (mill and fill); 1,500 SY of asphalt paving-full depth replacement, including base course; 400 CY of backfill undercut areas w/ crushed stone (including hauling and compaction); 400 CY of undercut (below subgrade) unsuitable soils, haul, and dispose on-site; see outside links for more details.
Perform inspection services during the reservoir 1 water treatment plant filter valve replacement project.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Perform inspection services during the reservoir 1 water treatment plant filter valve replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis