Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP seeks professional construction inspection services for the Reservoir 1 Water Treatment Plant Filter Valve Replacement Project, which includes replacing 24 electrically actuated valves, upgrading the Backwash Pump Station, and implementing electrical and SCADA system changes.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP is for the demolition of existing filter control building components, filter valves, operators, electrical conduit, wiring, PLC, and SCADA systems, and the installation of new filter control building, UPS shed, filter valves, bridge crane system, PLC, UPS, and SCADA systems, alongside extensive electrical modifications at the Reservoir 1 Water Treatment Plant.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
This RFP is for the demolition of existing filter control building components, filter valves, operators, electrical conduit, wiring, PLC, and SCADA systems, and the installation of new filter control building, UPS shed, filter valves, bridge crane system, PLC, UPS, and SCADA systems, alongside extensive electrical modifications at the Reservoir 1 Water Treatment Plant.
AvailableConstruction of sewage treatment plant improvements and sanitary sewer replacement.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
Construction of sewage treatment plant improvements and sanitary sewer replacement.
AvailableProvide CMAR for retrofitting the filters at a 28.8 MGD water treatment plant, preconstruction services including design constructability reviews and procurement services. Scope of work includes filter underdrain removal and replacement, removing and patching cast-in-place and grout in filter tanks, filter media removal and disposal, filter GAC media replacement, pipe modifications to facilitate media removal and replacement, non-potable water line for a new yard hydrant located outside the facility, and retrofitting filters to maintain continuity of plant operations.
Posted Date
Dec 25, 2025
Due Date
Jan 23, 2026
Release: Dec 25, 2025
Close: Jan 23, 2026
Provide CMAR for retrofitting the filters at a 28.8 MGD water treatment plant, preconstruction services including design constructability reviews and procurement services. Scope of work includes filter underdrain removal and replacement, removing and patching cast-in-place and grout in filter tanks, filter media removal and disposal, filter GAC media replacement, pipe modifications to facilitate media removal and replacement, non-potable water line for a new yard hydrant located outside the facility, and retrofitting filters to maintain continuity of plant operations.
AvailableThis RFP is for the removal and replacement of the existing 8" diameter reduced-pressure zone with pressure relief valve, gate valves, pressure reducing valves, automatic control valve, and associated plumbing at the Dixon Water Treatment Plant.
Posted Date
Jan 6, 2026
Due Date
Jan 21, 2026
Release: Jan 6, 2026
Close: Jan 21, 2026
This RFP is for the removal and replacement of the existing 8" diameter reduced-pressure zone with pressure relief valve, gate valves, pressure reducing valves, automatic control valve, and associated plumbing at the Dixon Water Treatment Plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis