Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the removal and replacement of the existing 8" diameter reduced-pressure zone with pressure relief valve, gate valves, pressure reducing valves, automatic control valve, and associated plumbing at the Dixon Water Treatment Plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Onslow Water & Sewer Authority (ONWASA) is soliciting bids to remove and replace the existing 8-inch reduced-pressure zone assembly at the Dixon Water Treatment Plant, including installation of valves, pressure gauges, and associated plumbing. The work includes removal of existing fittings, replacement with specified valves and pressure devices, pressure testing, disinfection, and site cleanup, with required submittal of manufacturer spec sheets prior to ordering. The contract must be completed within 45 calendar days from Notice to Proceed and bidders must hold a valid North Carolina Utilities Contractor license and provide required insurance and notarized bids.
Posted Date
Jan 6, 2026
Due Date
Jan 21, 2026
Release: Jan 6, 2026
Close: Jan 21, 2026
Onslow Water & Sewer Authority (ONWASA) is soliciting bids to remove and replace the existing 8-inch reduced-pressure zone assembly at the Dixon Water Treatment Plant, including installation of valves, pressure gauges, and associated plumbing. The work includes removal of existing fittings, replacement with specified valves and pressure devices, pressure testing, disinfection, and site cleanup, with required submittal of manufacturer spec sheets prior to ordering. The contract must be completed within 45 calendar days from Notice to Proceed and bidders must hold a valid North Carolina Utilities Contractor license and provide required insurance and notarized bids.
AvailableRFP for roof restorations and replacements, including labor, equipment, and materials, for the 2026 Water Treatment Plant.
Posted Date
Jan 5, 2026
Due Date
Jan 20, 2026
Release: Jan 5, 2026
Close: Jan 20, 2026
RFP for roof restorations and replacements, including labor, equipment, and materials, for the 2026 Water Treatment Plant.
AvailableDesign and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
AvailableThe City of Cocoa is soliciting a contractor to demolish and replace the existing carbon dioxide (CO2) system at the Dyal Water Treatment Plant and to demolish and remove the existing fluoride storage tank facilities. A mandatory pre‑bid conference is scheduled for Tuesday, January 13, 2026 at 10:00 AM EST at the plant. The estimated project value range is $500,000–$1,500,000 with a response deadline of February 6, 2026.
Posted Date
Dec 17, 2025
Due Date
Feb 6, 2026
Release: Dec 17, 2025
Close: Feb 6, 2026
The City of Cocoa is soliciting a contractor to demolish and replace the existing carbon dioxide (CO2) system at the Dyal Water Treatment Plant and to demolish and remove the existing fluoride storage tank facilities. A mandatory pre‑bid conference is scheduled for Tuesday, January 13, 2026 at 10:00 AM EST at the plant. The estimated project value range is $500,000–$1,500,000 with a response deadline of February 6, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.