Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Orange issued a PPEA solicitation for the rehabilitation of its Water Treatment Plant filter system, including the replacement of granular filter media and repair of underdrains. The project involves structural and process improvements to filtration units to meet Virginia Department of Health standards. The estimated value of the project ranges from $500,000 to $1,500,000 with a response deadline in April 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Perform inspection services during the reservoir 1 water treatment plant filter valve replacement project.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Perform inspection services during the reservoir 1 water treatment plant filter valve replacement project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of: demolition of existing Filter Control Building, filter valves, operators, electircal conduit, wire, PLC and SCADA systems, and installation of a new Filter Control Building, UPS Shed, Filter Valves, bridge crane system, PLC, UPS, and SCADA systems, and extensive electrical conduit and wire modifications at the Reservoir 1 Water Treatment Plant. Work includes structural concrete, wood structures, mechanical valves and piping, electrical equipment, conduit, wiring, and PLC and SCADA systems and other modifications.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
Work consists of: demolition of existing Filter Control Building, filter valves, operators, electircal conduit, wire, PLC and SCADA systems, and installation of a new Filter Control Building, UPS Shed, Filter Valves, bridge crane system, PLC, UPS, and SCADA systems, and extensive electrical conduit and wire modifications at the Reservoir 1 Water Treatment Plant. Work includes structural concrete, wood structures, mechanical valves and piping, electrical equipment, conduit, wiring, and PLC and SCADA systems and other modifications.
AvailableWater treatment plant roof replacement project.
Posted Date
Jan 19, 2026
Due Date
Feb 17, 2026
Release: Jan 19, 2026
Close: Feb 17, 2026
Water treatment plant roof replacement project.
AvailableWork includes replacement of roof on the water treatment plant facility.
Posted Date
Jan 23, 2026
Due Date
Feb 10, 2026
Release: Jan 23, 2026
Close: Feb 10, 2026
Work includes replacement of roof on the water treatment plant facility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →