Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Community College of Rhode Island (CCRI) is soliciting bids to remove the existing membrane roof, insulation, flashing, and related materials and to install a new 30-year roofing system at the Knight Campus Student Services building per the attached construction drawings. A pre-bid meeting is scheduled for January 9, 2026 at 1:00 PM at 400 East Avenue, Warwick, RI; onsite construction is expected to start Spring 2026 with substantial completion by June 1, 2026 and final completion by June 15, 2026. Vendors must provide bid surety or certified check, hold a valid Rhode Island Contractors Registration Board certificate, and meet insurance and other licensing requirements; liquidated damages of $250 per day apply for delays beyond substantial completion.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of approx. the removal and replacement of campus center roof and skylights; see outside link for more details.
Posted Date
Jan 14, 2026
Due Date
Feb 5, 2026
Release: Jan 14, 2026
Close: Feb 5, 2026
Work consists of approx. the removal and replacement of campus center roof and skylights; see outside link for more details.
AvailableThe scope of work includes removal of existing roofing, flashings, and related material at the uiuc arcade building and installation of new roofing, flashings and related material. The current roof is a blend of clay tile shingles and bur system. The bur roof system to be replaced with an 80 mil pvc. The clay tile shingles will be salvaged and reinstalled with a percent allowance for replacement of damaged tiles. Additional work includes select repointing, coping replacement/reinstallation, installation of exterior access ladders, and an access door to the roof at the existing stair
Posted Date
Nov 18, 2025
Due Date
Jan 29, 2026
Release: Nov 18, 2025
Close: Jan 29, 2026
The scope of work includes removal of existing roofing, flashings, and related material at the uiuc arcade building and installation of new roofing, flashings and related material. The current roof is a blend of clay tile shingles and bur system. The bur roof system to be replaced with an 80 mil pvc. The clay tile shingles will be salvaged and reinstalled with a percent allowance for replacement of damaged tiles. Additional work includes select repointing, coping replacement/reinstallation, installation of exterior access ladders, and an access door to the roof at the existing stair
The scope of work includes removal of existing roofing, flashings, and related material at the uiuc arcade building and installation of new roofing, flashings and related material. The current roof is a blend of clay tile shingles and bur system. The bur roof system to be replaced with an 80 mil pvc. The clay tile shingles will be salvaged and reinstalled with a percent allowance for replacement of damaged tiles. Additional work includes select repointing, coping replacement/reinstallation, installation of exterior access ladders, and an access door to the roof at the existing stair
Posted Date
Nov 18, 2025
Due Date
Jan 29, 2026
Release: Nov 18, 2025
Close: Jan 29, 2026
The scope of work includes removal of existing roofing, flashings, and related material at the uiuc arcade building and installation of new roofing, flashings and related material. The current roof is a blend of clay tile shingles and bur system. The bur roof system to be replaced with an 80 mil pvc. The clay tile shingles will be salvaged and reinstalled with a percent allowance for replacement of damaged tiles. Additional work includes select repointing, coping replacement/reinstallation, installation of exterior access ladders, and an access door to the roof at the existing stair
This RFP is for the roof replacement of the Doermer School of Business Building on the Fort Wayne Campus.
Posted Date
Jan 9, 2026
Due Date
Feb 26, 2026
Release: Jan 9, 2026
Close: Feb 26, 2026
This RFP is for the roof replacement of the Doermer School of Business Building on the Fort Wayne Campus.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis