Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of approx. the removal and replacement of campus center roof and skylights; see outside link for more details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for Roofing, Painting, and Electrical work related to Upper Campus Roof Replacement and Multi-Campus Improvements.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
This RFP is for Roofing, Painting, and Electrical work related to Upper Campus Roof Replacement and Multi-Campus Improvements.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The State University Construction Fund (SUCF) is soliciting Statements of Qualifications for design and construction administration services to replace the roof system (approx. 44,000 sq ft) of the Miller Campus Center at the State University of New York College of Technology at Canton, including skylight and rooftop equipment replacement and hazardous material abatement. The estimated construction value is approximately $5,676,000; consultants must register on the SUCF procurement page to receive the RFQ and upload their SOQ. The opportunity was posted 2025-12-30 and has a response deadline of 2026-01-22, and it is not a grant.
Posted Date
Dec 30, 2025
Due Date
Jan 22, 2026
Release: Dec 30, 2025
Close: Jan 22, 2026
The State University Construction Fund (SUCF) is soliciting Statements of Qualifications for design and construction administration services to replace the roof system (approx. 44,000 sq ft) of the Miller Campus Center at the State University of New York College of Technology at Canton, including skylight and rooftop equipment replacement and hazardous material abatement. The estimated construction value is approximately $5,676,000; consultants must register on the SUCF procurement page to receive the RFQ and upload their SOQ. The opportunity was posted 2025-12-30 and has a response deadline of 2026-01-22, and it is not a grant.
AvailableThe Community College of Rhode Island (CCRI) is soliciting bids to remove the existing membrane roof, insulation, flashing, and related materials and to install a new 30-year roofing system at the Knight Campus Student Services building per the attached construction drawings. A pre-bid meeting is scheduled for January 9, 2026 at 1:00 PM at 400 East Avenue, Warwick, RI; onsite construction is expected to start Spring 2026 with substantial completion by June 1, 2026 and final completion by June 15, 2026. Vendors must provide bid surety or certified check, hold a valid Rhode Island Contractors Registration Board certificate, and meet insurance and other licensing requirements; liquidated damages of $250 per day apply for delays beyond substantial completion.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
The Community College of Rhode Island (CCRI) is soliciting bids to remove the existing membrane roof, insulation, flashing, and related materials and to install a new 30-year roofing system at the Knight Campus Student Services building per the attached construction drawings. A pre-bid meeting is scheduled for January 9, 2026 at 1:00 PM at 400 East Avenue, Warwick, RI; onsite construction is expected to start Spring 2026 with substantial completion by June 1, 2026 and final completion by June 15, 2026. Vendors must provide bid surety or certified check, hold a valid Rhode Island Contractors Registration Board certificate, and meet insurance and other licensing requirements; liquidated damages of $250 per day apply for delays beyond substantial completion.
AvailableCampus Boiler Replacement And HVAC Controls Upgrade.
Posted Date
Jan 10, 2026
Due Date
Jan 30, 2026
Release: Jan 10, 2026
Close: Jan 30, 2026
Campus Boiler Replacement And HVAC Controls Upgrade.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →