Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
Total number of staff members.
Highest grade level offered.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Use only if the solution is uniquely proprietary and required for compatibility; otherwise pivot back to coops.
Coops: Lead with Sourcewell/TIPS/KPN/OMNIA; for IT, route via CDW-G on a matching co-op.
McHenry Community High School District 156 permits sole source primarily for established proprietary systems (e.g., Powerschool, Skyward) and utilities. Viable only if the solution is unique, non-substitutable, and required to integrate with existing core systems.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across McHenry Community High School District 156's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
President - MCHS Board of Education
District Division Chair of CTE/Business Education Instructor
Upper Campus Principal
Assistant Superintendent for Special Services
Premium
Access the largest public sector contact database
Active opportunities open for bidding
McHenry Community High School District 156
This RFP is for Roofing, Painting, and Electrical work related to Upper Campus Roof Replacement and Multi-Campus Improvements.
Posted Date
-
Due Date
Jan 20, 2026
McHenry Community High School District 156
Close: Jan 20, 2026
This RFP is for Roofing, Painting, and Electrical work related to Upper Campus Roof Replacement and Multi-Campus Improvements.
AvailableMcHenry Community High School District 156
Work includes approx 320 LF of silt fence; 680 LF of sawcut, full depth; 230 tn HMA surface course; 1,820 SY 5" PCC sidewalk. 1 LS mobilization; 1 LS earth excavation (special); 320 LF silt fence; 1,300 LF construction fence; 1 EA rock construction entrance; 23 EA inlet filter basket; 680 LF sawcut, full depth; 8,600 SY pavement removal (full depth); 1 EA cleanout removal; 2 ea inlet removal; 30 LF utility removal; 1 EA light post and foundation removal; 1 EA bike rack removal; 300 LF fence removal; 300 lf guardrail removal; 4 EA post removal; 5 EA sign removal; 4,000 sf sidewalk removal; 620 sf concrete pavement removal; 700 LF curb and gutter removal; 525 CY removal and disposal of unsuitable, replacement with ca-1; 190 SF detectable warning panels. See attached file.
Posted Date
Oct 30, 2025
Due Date
Nov 21, 2025
Release: Oct 30, 2025
McHenry Community High School District 156
Close: Nov 21, 2025
Work includes approx 320 LF of silt fence; 680 LF of sawcut, full depth; 230 tn HMA surface course; 1,820 SY 5" PCC sidewalk. 1 LS mobilization; 1 LS earth excavation (special); 320 LF silt fence; 1,300 LF construction fence; 1 EA rock construction entrance; 23 EA inlet filter basket; 680 LF sawcut, full depth; 8,600 SY pavement removal (full depth); 1 EA cleanout removal; 2 ea inlet removal; 30 LF utility removal; 1 EA light post and foundation removal; 1 EA bike rack removal; 300 LF fence removal; 300 lf guardrail removal; 4 EA post removal; 5 EA sign removal; 4,000 sf sidewalk removal; 620 sf concrete pavement removal; 700 LF curb and gutter removal; 525 CY removal and disposal of unsuitable, replacement with ca-1; 190 SF detectable warning panels. See attached file.
McHenry Community High School District 156
Removal of the existing Wood Shop dust collector and all existing dust collection ductwork. Installation of new dust collector and associated electrical connections. Installation of new dust collection ductwork and accessories. Installation of new electrical outlets for Owner provided Wood Shop equipment.
Posted Date
Jun 27, 2025
Due Date
Jul 28, 2025
Release: Jun 27, 2025
McHenry Community High School District 156
Close: Jul 28, 2025
Removal of the existing Wood Shop dust collector and all existing dust collection ductwork. Installation of new dust collector and associated electrical connections. Installation of new dust collection ductwork and accessories. Installation of new electrical outlets for Owner provided Wood Shop equipment.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.