Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work includes removal of existing roofing, flashings, and related material at the uiuc arcade building and installation of new roofing, flashings and related material. The current roof is a blend of clay tile shingles and bur system. The bur roof system to be replaced with an 80 mil pvc. The clay tile shingles will be salvaged and reinstalled with a percent allowance for replacement of damaged tiles. Additional work includes select repointing, coping replacement/reinstallation, installation of exterior access ladders, and an access door to the roof at the existing stair
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The scope of work includes removal of existing roofing, flashings, and related material at the uiuc arcade building and installation of new roofing, flashings and related material. The current roof is a blend of clay tile shingles and bur system. The bur roof system to be replaced with an 80 mil pvc. The clay tile shingles will be salvaged and reinstalled with a percent allowance for replacement of damaged tiles. Additional work includes select repointing, coping replacement/reinstallation, installation of exterior access ladders, and an access door to the roof at the existing stair
Posted Date
Nov 18, 2025
Due Date
Jan 29, 2026
Release: Nov 18, 2025
Close: Jan 29, 2026
The scope of work includes removal of existing roofing, flashings, and related material at the uiuc arcade building and installation of new roofing, flashings and related material. The current roof is a blend of clay tile shingles and bur system. The bur roof system to be replaced with an 80 mil pvc. The clay tile shingles will be salvaged and reinstalled with a percent allowance for replacement of damaged tiles. Additional work includes select repointing, coping replacement/reinstallation, installation of exterior access ladders, and an access door to the roof at the existing stair
AvailableProcurement of services for roof replacement at the MVC Administration Building.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
Procurement of services for roof replacement at the MVC Administration Building.
AvailableReplacement of the municipal building roof in the borough.
Posted Date
Jan 18, 2026
Due Date
Jan 28, 2026
Release: Jan 18, 2026
Close: Jan 28, 2026
Replacement of the municipal building roof in the borough.
AvailableRoof replacement and building repair services at community center.
Posted Date
Jan 21, 2026
Due Date
Feb 6, 2026
Release: Jan 21, 2026
Close: Feb 6, 2026
Roof replacement and building repair services at community center.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis