Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The installation of 8” Watermain with 1” service lines on Cass St. from Lansing St. continuing east on Cass St to Church St. Watermain must be installed, disinfected and pressure tested according to AWWA and City Standards. All changes and or deviations from the approved plans must be approved by City of Water Division Staff. The project is part of the annual City of Street project therefore no restoration of asphalt, concrete and or lawn repairs at service line connections.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking proposal watermain capacity-fire hydrant flow testing and assessment program.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Seeking proposal watermain capacity-fire hydrant flow testing and assessment program.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes Installation of an 8" HDPE watermain connecting existing watermains installation of approx. 1400 LF of 8" dia. HDPE watermain using open cut and directional drilling methods; installation of hydrants, services, and other appurtenances associated with installation of the watermain; restoration of disturbed surfaces, including concrete sidewalk and driveway patching, asphalt patching, and placement of topsoil and seed; and associated erosion control and traffic control.
Posted Date
Dec 31, 2025
Due Date
Jan 20, 2026
Release: Dec 31, 2025
Close: Jan 20, 2026
Project includes Installation of an 8" HDPE watermain connecting existing watermains installation of approx. 1400 LF of 8" dia. HDPE watermain using open cut and directional drilling methods; installation of hydrants, services, and other appurtenances associated with installation of the watermain; restoration of disturbed surfaces, including concrete sidewalk and driveway patching, asphalt patching, and placement of topsoil and seed; and associated erosion control and traffic control.
AvailableInstalling large-scale murals on roadway surfaces that cover up to 25,000 SF, managing volunteers, preparing streets for the installation of murals, managing an inventory of paint, and effectively recruiting and training staff. The successful vendor will install large-scale murals painted directly onto roadway and sidewalk surfaces that include concrete and asphalt surfaces. These paintings typically range in size from 2,000 to 25,000 SF. The PBOT Street Painting Program includes Painted Street Plazas ("plazas") and residential street paintings. In addition to installation, these paintings require a company to do maintenance work that can include street cleaning, repainting large scale murals, and ongoing maintenance of the paintings. The vendor will also paint plaza furniture or other items within the plazas as needed.
Posted Date
Dec 3, 2025
Due Date
Jan 23, 2026
Release: Dec 3, 2025
Close: Jan 23, 2026
Installing large-scale murals on roadway surfaces that cover up to 25,000 SF, managing volunteers, preparing streets for the installation of murals, managing an inventory of paint, and effectively recruiting and training staff. The successful vendor will install large-scale murals painted directly onto roadway and sidewalk surfaces that include concrete and asphalt surfaces. These paintings typically range in size from 2,000 to 25,000 SF. The PBOT Street Painting Program includes Painted Street Plazas ("plazas") and residential street paintings. In addition to installation, these paintings require a company to do maintenance work that can include street cleaning, repainting large scale murals, and ongoing maintenance of the paintings. The vendor will also paint plaza furniture or other items within the plazas as needed.
AvailableWork consist of watermain.
Posted Date
-
Due Date
Feb 3, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →