Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of watermain.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Watermain lining and replacement of watermain. The work will also include: watermain lining of 12", 10", 8" and 6" ductile iron watermain. Replacement of 6 "watermain with new 8" di watermain. Replacement of all service b-boxes. Replacement of all existing hydrants with new ej hydrants. Replacement of all existing valves with new rw valves. New service lines on the woburn ct where main is being replaced. Four (4) full service line replacements from b-box to meter near crystal tree subdivision. Replacement of storm pipe with watermain quality pipe at various crossings. Curb replacement. Sidewalk replacement. Asphalt replacement. Sod restoration. Possible road closure and detour signage and planning.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Watermain lining and replacement of watermain. The work will also include: watermain lining of 12", 10", 8" and 6" ductile iron watermain. Replacement of 6 "watermain with new 8" di watermain. Replacement of all service b-boxes. Replacement of all existing hydrants with new ej hydrants. Replacement of all existing valves with new rw valves. New service lines on the woburn ct where main is being replaced. Four (4) full service line replacements from b-box to meter near crystal tree subdivision. Replacement of storm pipe with watermain quality pipe at various crossings. Curb replacement. Sidewalk replacement. Asphalt replacement. Sod restoration. Possible road closure and detour signage and planning.
AvailableProject includes Installation of an 8" HDPE watermain connecting existing watermains installation of approx. 1400 LF of 8" dia. HDPE watermain using open cut and directional drilling methods; installation of hydrants, services, and other appurtenances associated with installation of the watermain; restoration of disturbed surfaces, including concrete sidewalk and driveway patching, asphalt patching, and placement of topsoil and seed; and associated erosion control and traffic control.
Posted Date
Dec 31, 2025
Due Date
Jan 20, 2026
Release: Dec 31, 2025
Close: Jan 20, 2026
Project includes Installation of an 8" HDPE watermain connecting existing watermains installation of approx. 1400 LF of 8" dia. HDPE watermain using open cut and directional drilling methods; installation of hydrants, services, and other appurtenances associated with installation of the watermain; restoration of disturbed surfaces, including concrete sidewalk and driveway patching, asphalt patching, and placement of topsoil and seed; and associated erosion control and traffic control.
AvailableThe installation of 8” Watermain with 1” service lines on Cass St. from Lansing St. continuing east on Cass St to Church St. Watermain must be installed, disinfected and pressure tested according to AWWA and City Standards. All changes and or deviations from the approved plans must be approved by City of Water Division Staff. The project is part of the annual City of Street project therefore no restoration of asphalt, concrete and or lawn repairs at service line connections.
Posted Date
Jan 7, 2026
Due Date
Jan 26, 2026
Release: Jan 7, 2026
Close: Jan 26, 2026
The installation of 8” Watermain with 1” service lines on Cass St. from Lansing St. continuing east on Cass St to Church St. Watermain must be installed, disinfected and pressure tested according to AWWA and City Standards. All changes and or deviations from the approved plans must be approved by City of Water Division Staff. The project is part of the annual City of Street project therefore no restoration of asphalt, concrete and or lawn repairs at service line connections.
AvailableConstruct approximately 2,697 feet of 8”, 3,993 feet of 6\", and 13 feet of 4\" diameter watermain and new water services, fire hydrants, and mainline valves complete with all necessary appurtenances and surface restoration.
Posted Date
Dec 12, 2025
Due Date
Jan 28, 2026
Release: Dec 12, 2025
Close: Jan 28, 2026
Construct approximately 2,697 feet of 8”, 3,993 feet of 6\", and 13 feet of 4\" diameter watermain and new water services, fire hydrants, and mainline valves complete with all necessary appurtenances and surface restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →