Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes Installation of an 8" HDPE watermain connecting existing watermains installation of approx. 1400 LF of 8" dia. HDPE watermain using open cut and directional drilling methods; installation of hydrants, services, and other appurtenances associated with installation of the watermain; restoration of disturbed surfaces, including concrete sidewalk and driveway patching, asphalt patching, and placement of topsoil and seed; and associated erosion control and traffic control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Farley, Iowa is soliciting bids for the 3rd Avenue SW Reconstruction project. The advertisement lists a posting date of January 8, 2026 with bids due January 29, 2026. The project is a public works roadway reconstruction effort, not a grant program.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
The City of Farley, Iowa is soliciting bids for the 3rd Avenue SW Reconstruction project. The advertisement lists a posting date of January 8, 2026 with bids due January 29, 2026. The project is a public works roadway reconstruction effort, not a grant program.
AvailableWork includes approx 1,049 LF of 8" C900 18 PVC water main; 2,995 LF of 10" C900 18 PVC water main; 1,258 LF of Concrete Gurb and Gutter; 607 LF of 4" Pavement Marking; 60 LF of 1.25" of Water service pipe. See outside link.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Work includes approx 1,049 LF of 8" C900 18 PVC water main; 2,995 LF of 10" C900 18 PVC water main; 1,258 LF of Concrete Gurb and Gutter; 607 LF of 4" Pavement Marking; 60 LF of 1.25" of Water service pipe. See outside link.
AvailableWork consist of watermain.
Posted Date
-
Due Date
Feb 3, 2026
Watermain lining and replacement of watermain. The work will also include: watermain lining of 12", 10", 8" and 6" ductile iron watermain. Replacement of 6 "watermain with new 8" di watermain. Replacement of all service b-boxes. Replacement of all existing hydrants with new ej hydrants. Replacement of all existing valves with new rw valves. New service lines on the woburn ct where main is being replaced. Four (4) full service line replacements from b-box to meter near crystal tree subdivision. Replacement of storm pipe with watermain quality pipe at various crossings. Curb replacement. Sidewalk replacement. Asphalt replacement. Sod restoration. Possible road closure and detour signage and planning.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Watermain lining and replacement of watermain. The work will also include: watermain lining of 12", 10", 8" and 6" ductile iron watermain. Replacement of 6 "watermain with new 8" di watermain. Replacement of all service b-boxes. Replacement of all existing hydrants with new ej hydrants. Replacement of all existing valves with new rw valves. New service lines on the woburn ct where main is being replaced. Four (4) full service line replacements from b-box to meter near crystal tree subdivision. Replacement of storm pipe with watermain quality pipe at various crossings. Curb replacement. Sidewalk replacement. Asphalt replacement. Sod restoration. Possible road closure and detour signage and planning.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis