Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 52 SY removal of asphalt pavement all depths; 25 LF removal of curb and gutter all types; 2 EA removal of debris and sand from drainage manhole; 325 LF removal of debris and sand from pipe all size; 77 LF removal of pipe 8" and above; 58 CY borrow excavation AH FME class B9; 43 CY excess excavation FM AH; 22 CY structure excavation. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.
AvailableThe Town of Westford, Massachusetts is soliciting bids for intersection improvements at North Main Street and West Street. The project includes realignment of West Street, drainage work, ADA‑compliant curb ramps, sidewalks, curbing, paving, and other miscellaneous roadway work. Bids are due January 14, 2026 at 2:00 PM ET, and bid documents are available beginning December 17, 2025 via the Town’s website.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
The Town of Westford, Massachusetts is soliciting bids for intersection improvements at North Main Street and West Street. The project includes realignment of West Street, drainage work, ADA‑compliant curb ramps, sidewalks, curbing, paving, and other miscellaneous roadway work. Bids are due January 14, 2026 at 2:00 PM ET, and bid documents are available beginning December 17, 2025 via the Town’s website.
The major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
Posted Date
Oct 29, 2025
Due Date
Jan 15, 2026
Release: Oct 29, 2025
Close: Jan 15, 2026
The major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
Intersection improvements.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Intersection improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis