Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Structure & approach grading.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes removals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, curb and gutter, beam guard, erosion control, permanent signing, traffic control, pavement marking, restoration.
Posted Date
Nov 4, 2025
Due Date
Jan 13, 2026
Release: Nov 4, 2025
Close: Jan 13, 2026
Work includes removals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, curb and gutter, beam guard, erosion control, permanent signing, traffic control, pavement marking, restoration.
Premium
Access the largest public sector contact database
Grading, drainage, paving, and structure.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Grading, drainage, paving, and structure.
AvailableThe contractor is responsible for furnishing all labor, equipment, materials, and supplies necessary to construct the access drives and substation pad in full accordance with the specifications and drawings for point of delivery 5 (pod 5). This includes performing all required cutting, filling, grading, compaction, and soil stabilization, as well as grubbing designated road and pad areas and roughening slopes prior to additional land-disturbing activities. The top 0–12" of topsoil in the access road and pad areas must be removed and replaced with owner- approved soil per the geotechnical engineering recommendations. Although the drawings reference tree clearing and initial erosion control installations, these activities will be completed by the owner before the contractor begins work; however, the contractor is responsible for maintaining all existing erosion control devices throughout the contract period. All stone required for construction must be installed during the contract, while final removal of erosion control measures and permanent seeding will occur later in coordination with the owner.
Posted Date
Dec 2, 2025
Due Date
Dec 18, 2025
Release: Dec 2, 2025
Close: Dec 18, 2025
The contractor is responsible for furnishing all labor, equipment, materials, and supplies necessary to construct the access drives and substation pad in full accordance with the specifications and drawings for point of delivery 5 (pod 5). This includes performing all required cutting, filling, grading, compaction, and soil stabilization, as well as grubbing designated road and pad areas and roughening slopes prior to additional land-disturbing activities. The top 0–12" of topsoil in the access road and pad areas must be removed and replaced with owner- approved soil per the geotechnical engineering recommendations. Although the drawings reference tree clearing and initial erosion control installations, these activities will be completed by the owner before the contractor begins work; however, the contractor is responsible for maintaining all existing erosion control devices throughout the contract period. All stone required for construction must be installed during the contract, while final removal of erosion control measures and permanent seeding will occur later in coordination with the owner.
AvailableWater intake contract B tunnels, shafts, and intake structure. Rock Tunnel and Shaft Construction - Includes construction of the pump station tunnel, pump station shaft, and intermediate shaft. Rock tunneling methods, including drilling and blasting, are required to construct the tunnel and shafts. Permanent linings will be installed in the pump station shaft and pump station tunnel. Microtunnel Construction - Microtunneling is planned to construct the intake tunnel. Intake Structure Construction - The intake structure will be constructed in Lake Sidney Lanier. The work will involve various underwater construction processes.
Posted Date
Oct 30, 2025
Due Date
Jan 8, 2026
Release: Oct 30, 2025
Close: Jan 8, 2026
Water intake contract B tunnels, shafts, and intake structure. Rock Tunnel and Shaft Construction - Includes construction of the pump station tunnel, pump station shaft, and intermediate shaft. Rock tunneling methods, including drilling and blasting, are required to construct the tunnel and shafts. Permanent linings will be installed in the pump station shaft and pump station tunnel. Microtunnel Construction - Microtunneling is planned to construct the intake tunnel. Intake Structure Construction - The intake structure will be constructed in Lake Sidney Lanier. The work will involve various underwater construction processes.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis