Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Grading, drainage, paving, and structure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Grading, drainage, paving, and structure. Construct Portland cement concrete curb, concrete curb and gutter, concrete gutter, shoulder berm gutter, concrete expressway gutter and 4 inch concrete valley gutter as shown in the contract. See attached file.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Grading, drainage, paving, and structure. Construct Portland cement concrete curb, concrete curb and gutter, concrete gutter, shoulder berm gutter, concrete expressway gutter and 4 inch concrete valley gutter as shown in the contract. See attached file.
AvailableRemoval of structure, box culvert, grading, and incidentals, 0.160 miles. Work include, 4,034 CY, Borrow-excavation. 3,218 LF, FIBER ROLLS 12IN. 900 Acre, Wetland Mitigation Site 1.
Posted Date
Nov 17, 2025
Due Date
Dec 12, 2025
Release: Nov 17, 2025
Close: Dec 12, 2025
Removal of structure, box culvert, grading, and incidentals, 0.160 miles. Work include, 4,034 CY, Borrow-excavation. 3,218 LF, FIBER ROLLS 12IN. 900 Acre, Wetland Mitigation Site 1.
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls grading; 1 acr supplementary clearing & grubbing; 400 cy undercut excavation; 400 cy select granular material; 400 sy geotextile for soil stabilization; 847 sf temporary shoring; 1,500 ton rock embankments; 2,200 sy geotextile for rock embankments; 1,575 sy generic grading item rock plating over rock embankments; lump sum ls generic grading item type 1 bridge approach fill, station 15+40. 00 -l-. See attached file for full scope.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls grading; 1 acr supplementary clearing & grubbing; 400 cy undercut excavation; 400 cy select granular material; 400 sy geotextile for soil stabilization; 847 sf temporary shoring; 1,500 ton rock embankments; 2,200 sy geotextile for rock embankments; 1,575 sy generic grading item rock plating over rock embankments; lump sum ls generic grading item type 1 bridge approach fill, station 15+40. 00 -l-. See attached file for full scope.
AvailableLump sum ls mobilization; lump sum ls construction surveying; lump sum ls grading; 1 acr supplementary clearing & grubbing; 900 cy undercut excavation; 30 cy drainage ditch excavation; 10 hr proof rolling; 800 cy select granular material; 800 sy geotextile for soil stabilization; 700 sy rock plating; 50 ton generic grading item; hauling and disposal of petroleum contaminated soil; 780 ton foundation conditioning material, minor structures; 2,440 sy foundation conditioning geotextile; 20 lf 12" drainage pipe;
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls grading; 1 acr supplementary clearing & grubbing; 900 cy undercut excavation; 30 cy drainage ditch excavation; 10 hr proof rolling; 800 cy select granular material; 800 sy geotextile for soil stabilization; 700 sy rock plating; 50 ton generic grading item; hauling and disposal of petroleum contaminated soil; 780 ton foundation conditioning material, minor structures; 2,440 sy foundation conditioning geotextile; 20 lf 12" drainage pipe;
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis