Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls grading; 1 acr supplementary clearing & grubbing; 400 cy undercut excavation; 400 cy select granular material; 400 sy geotextile for soil stabilization; 847 sf temporary shoring; 1,500 ton rock embankments; 2,200 sy geotextile for rock embankments; 1,575 sy generic grading item rock plating over rock embankments; lump sum ls generic grading item type 1 bridge approach fill, station 15+40. 00 -l-. See attached file for full scope.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls clearing & grubbing. . Acre(s); 1 acr supplementary clearing & grubbing; 2 ea sealing abandoned wells; 5,200 cy unclassified excavation; 4,250 cy undercut excavation; 74,000 cy borrow excavation; 61. 9 cy drainage ditch excavation; 1,030 sy removal of existing asphalt pavement; 1,030 sy breaking of existing asphalt pavement; 4,050 cy select granular material; 5,550 sy geotextile for soil stabilization; 1,915 sf temporary shoring; 180 sy rock plating; lump sum ls generic grading item; type 2 bridge approach fill, station 119+69. 55 -y-; 390 ton foundation conditioning material, minor structures. See attached file for full scope.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls clearing & grubbing. . Acre(s); 1 acr supplementary clearing & grubbing; 2 ea sealing abandoned wells; 5,200 cy unclassified excavation; 4,250 cy undercut excavation; 74,000 cy borrow excavation; 61. 9 cy drainage ditch excavation; 1,030 sy removal of existing asphalt pavement; 1,030 sy breaking of existing asphalt pavement; 4,050 cy select granular material; 5,550 sy geotextile for soil stabilization; 1,915 sf temporary shoring; 180 sy rock plating; lump sum ls generic grading item; type 2 bridge approach fill, station 119+69. 55 -y-; 390 ton foundation conditioning material, minor structures. See attached file for full scope.
AvailableLump sum ls mobilization; lump sum ls construction surveying; lump sum ls grading; 1 acr supplementary clearing & grubbing; 900 cy undercut excavation; 30 cy drainage ditch excavation; 10 hr proof rolling; 800 cy select granular material; 800 sy geotextile for soil stabilization; 700 sy rock plating; 50 ton generic grading item; hauling and disposal of petroleum contaminated soil; 780 ton foundation conditioning material, minor structures; 2,440 sy foundation conditioning geotextile; 20 lf 12" drainage pipe;
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls grading; 1 acr supplementary clearing & grubbing; 900 cy undercut excavation; 30 cy drainage ditch excavation; 10 hr proof rolling; 800 cy select granular material; 800 sy geotextile for soil stabilization; 700 sy rock plating; 50 ton generic grading item; hauling and disposal of petroleum contaminated soil; 780 ton foundation conditioning material, minor structures; 2,440 sy foundation conditioning geotextile; 20 lf 12" drainage pipe;
Grading, drainage, paving, and structure.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Grading, drainage, paving, and structure.
AvailableGrading, drainage, paving, and structure. Construct Portland cement concrete curb, concrete curb and gutter, concrete gutter, shoulder berm gutter, concrete expressway gutter and 4 inch concrete valley gutter as shown in the contract. See attached file.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Grading, drainage, paving, and structure. Construct Portland cement concrete curb, concrete curb and gutter, concrete gutter, shoulder berm gutter, concrete expressway gutter and 4 inch concrete valley gutter as shown in the contract. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis