Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The contractor is responsible for furnishing all labor, equipment, materials, and supplies necessary to construct the access drives and substation pad in full accordance with the specifications and drawings for point of delivery 5 (pod 5). This includes performing all required cutting, filling, grading, compaction, and soil stabilization, as well as grubbing designated road and pad areas and roughening slopes prior to additional land-disturbing activities. The top 0–12" of topsoil in the access road and pad areas must be removed and replaced with owner- approved soil per the geotechnical engineering recommendations. Although the drawings reference tree clearing and initial erosion control installations, these activities will be completed by the owner before the contractor begins work; however, the contractor is responsible for maintaining all existing erosion control devices throughout the contract period. All stone required for construction must be installed during the contract, while final removal of erosion control measures and permanent seeding will occur later in coordination with the owner.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Nov 6, 2025
Close: Dec 16, 2025
Provide grading, gravelling & paving.
AvailableWork consists of grading, installing storm drainage, and placing asphalt concrete.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
Work consists of grading, installing storm drainage, and placing asphalt concrete.
AvailableWork consists of grading, installing storm drainage, and placing asphalt concrete.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
Work consists of grading, installing storm drainage, and placing asphalt concrete.
AvailableConstruction of clearing and grading of approximately 66.5 acres
Posted Date
Nov 16, 2025
Due Date
Dec 15, 2025
Release: Nov 16, 2025
Close: Dec 15, 2025
Construction of clearing and grading of approximately 66.5 acres
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis