Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Southern Cayuga Lake Intermunicipal Water Commission
Project consists primarily of a new electrical building, hvac for new electrical building, site work for installation of new building and electrical equipment, new panelboard, transformer and associated circuiting, new circuiting to support relocated motor control center, installation of owner-supplied equipment including a 1,500kva transformer, 1,600a automatic transfer switch, 1,600a main circuit breaker, and 1,600a motor control center, new 35kv gang operated air break switch on existing structure, replacement of existing exhaust fans and starters in existing pump room, and replacement of powered overhead door operator.
Posted Date
Feb 26, 2026
Due Date
Mar 26, 2026
Release: Feb 26, 2026
Southern Cayuga Lake Intermunicipal Water Commission
Close: Mar 26, 2026
Project consists primarily of a new electrical building, hvac for new electrical building, site work for installation of new building and electrical equipment, new panelboard, transformer and associated circuiting, new circuiting to support relocated motor control center, installation of owner-supplied equipment including a 1,500kva transformer, 1,600a automatic transfer switch, 1,600a main circuit breaker, and 1,600a motor control center, new 35kv gang operated air break switch on existing structure, replacement of existing exhaust fans and starters in existing pump room, and replacement of powered overhead door operator.
AvailableSouthern Cayuga Lake Intermunicipal Water Commission
The Liquid Filled Pad Mount Transformer Pre Purchase Equipment consists primarily of: 1. A new 34,500Y/19.900V-480Y/277V, 1,500 KVA Transformer. 2. Copper or Aluminum Windings. 3. FR3 Fluid. 4. Storage.
Posted Date
Nov 24, 2025
Due Date
Dec 19, 2025
Release: Nov 24, 2025
Southern Cayuga Lake Intermunicipal Water Commission
Close: Dec 19, 2025
The Liquid Filled Pad Mount Transformer Pre Purchase Equipment consists primarily of: 1. A new 34,500Y/19.900V-480Y/277V, 1,500 KVA Transformer. 2. Copper or Aluminum Windings. 3. FR3 Fluid. 4. Storage.
Southern Cayuga Lake Intermunicipal Water Commission
The Switchboards 600 Volts and Under Pre Purchase Equipment consists primarily of: 1. A new 1,600A, 480Y/277V Main Circuit Breaker as Manufactured by ABB.
Posted Date
Nov 24, 2025
Due Date
Dec 19, 2025
Release: Nov 24, 2025
Southern Cayuga Lake Intermunicipal Water Commission
Close: Dec 19, 2025
The Switchboards 600 Volts and Under Pre Purchase Equipment consists primarily of: 1. A new 1,600A, 480Y/277V Main Circuit Breaker as Manufactured by ABB.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Southern Cayuga Lake Intermunicipal Water Commission's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database